The VHMPID R&D plan & PNU activity

The VHMPID R&D plan & PNU activity. JunGyu Yi Pusan National University KoALICE meeting 2012/05/23. VHMPID Upgrade at ALICE. ALICE Y. layout. View from the “ A ” side. ALICE X. FEE : based on HMPID ‘ Gassiplex. MWPC (or TGEM) – MIP. VHMPID in sector 11: 220< phi <240 deg.

fordon
Download Presentation

The VHMPID R&D plan & PNU activity

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The VHMPID R&D plan& PNU activity JunGyu Yi Pusan National University KoALICE meeting 2012/05/23

  2. VHMPID Upgrade at ALICE ALICE Y • layout Viewfrom the “A” side ALICE X FEE : based on HMPID ‘Gassiplex MWPC (or TGEM) – MIP VHMPID insector 11: 220<phi<240 deg VHMPID insector 12: 240<phi<260 deg CaF2 / Saphaire quartz window CsI photon detector Radiator: C4F10 gas, 80cm~100cm Spherical concave Mirror: C-fibersubstrate & Al + MgF2 coating Detector acceptance ~30% of TPC acceptance in mid-rapidity (h = +-0.5) KoAlice Meeting

  3. R&D Status • Physics Goal • pi,K,p PID up to p=25GeV/c • ‘Jet’ Physics with high pT particle • ‘track by track’ PID  indentified high pT ‘jet’ analysis • Detector prototype test is on going ! simulations for, - (left) fragmentation factor - (right) dN/dpT comparison with TPC by Rene Bellwied – ALICE Upgrade forum KoAlice Meeting

  4. beam test in 2011 PS/T10 area, July 2011 VHMPID prototype-test KoAlice Meeting

  5. R&D Focus in 2012 • Pressurized Radiator • ‘Pressurized’ option test with, • Vessel • Gas System + Heating • Control system • Data Taking rate test KoAlice Meeting

  6. PNU activity - Transp.Meter where, [Reference] VHMPID meeting - Sep.28, 2011

  7. Progress in 2011 C4F8O C4F10 • New Adapted PLC auto scanning system • based on PLC ‘STEP7’ program • PVSS GUI panel ; easy to use • Jihye Song ill be join at this project KoAlice Meeting

  8. Summary & Outlook • Schedule for this spring • 5/31~6/11, 1st Beam Time • is more technical • the main aim is to commission and understand the pressurized system. • 6/25~7/9, 2nd Beam Time • The real serial measurement • with shifts for data taking and analysis. • Working plan • Beam test shifts • Pressurized Gas system : Installations & setup • Transparency modification • hardware repair & upgrade • simulation code implementations KoAlice Meeting