Phoenix Regional ITS Fiber Optic Backbone

Phoenix Regional ITS Fiber Optic Backbone. PURPOSES. Improve agency operations by establishing a shared, regional, telecommunications network. Create a regional, multi user communications network to improve and support ITS and homeland security. MAG Regional Communications Network Study.

forest
Download Presentation

Phoenix Regional ITS Fiber Optic Backbone

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Phoenix RegionalITSFiber Optic Backbone

  2. PURPOSES Improve agency operations by establishing a shared, regional, telecommunications network. Create a regional, multi user communications network to improve and support ITS and homeland security.

  3. MAGRegional CommunicationsNetwork Study • PHX regional ITS backbone provides key links

  4. AZTech TelecommunicationsOverview • PHX regional ITS backbone is a Key Component

  5. Phase AActive Partners • ADOT Transportation Technology Group • Phoenix Aviation • Phoenix Information Technology • Phoenix Street Transportation • Phoenix Transit

  6. Phase APassive Partners • Light Rail Transit • DPS • Phoenix PD • Phoenix Fire

  7. Phase A Downtown to Deer Valley Airport

  8. TMC @ City Hall • Washington – Jefferson • 19th Ave. Corridor • Loop 101 • 7th Ave.

  9. Phase AMajor Connections • Connect ADOT TOC to ADOT HQ • Connect Sky Harbor to Deer Valley • Connect Transit to ADOT TOC and RAPID • Provide ITD 96 SMFO • Provide 12 SMFO for Regional Use • Connect PHX TMC to (43) Traffic Signals and (1) Dynamic Message sign

  10. ITS Components 43 Traffic Signals 1 Dynamic Message Sign

  11. ProjectDetails • Length 21 Miles • 8 miles New Conduit • 13 Miles Existing Conduit • (1) 144 or (1) 96 Fiber SMFO for Backbone • 12 Fiber SMFO for Branches

  12. Status • Design Concept Report – November 2002 • Environmental Approval – January 2004 • Construction Approval – April 2004 • Advertise for Construction – June 2004

  13. Estimated Construction Cost Phase A $3-4 Million

  14. Contract Mechanism CM@R

  15. Questions ?