An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Submarine Evacuation System for Offshore Structures Client: Dr. Michael Hinchey

  2. Agenda • Project Overview • Prototype Design Evolution • Structural • Material • Control • Analysis • Lifting • Finite Element Analysis (FEA) • Motion (Flow3D) • Control Codes & Sequence • Testing Methods • Deployment Strategies • Moving Forward • Questions

  3. Project Overview • Current Problem • Lifeboats – Exposed to Hazards • Freefall – Uncontrolled • Proposed Solution • Deployable Submarine • Project Goals • Develop and Test Automated Submarine Prototype • Develop and Test Deployment Options • Identify Design Requirements • Prove Operational Viability • Make Recommendations on Full-scale Development

  4. Prototype Design Evolution • Structural • Lifting Hook • Tail Sweep • Propeller Shroud • Material • Previous – 6” OD Aluminum Round Stock • Current • Hull – 6” ID, PVC Pipe • Endcaps – Solid Round Stock ABS • Shroud – RP ABS Phase 1 Phase 2

  5. Prototype Design Evolution • Controls • Experimental Circuit (Breadboard) • Initial code testing • Printed Circuit Board (PCB) • Fine-tuning with prototype equipment • Execute submarine control

  6. Analysis: Lifting • Applied Load: 125 (N) • Maximum Lift Acceleration: 1 (m/s2) • Lifting Hook – ¼” x 20 UNC Nylon • Maximum Stress due to Bending • Lifting Angle Limit: 10° (S.F. 2) • Torque Requirement: 1 (N-m) • End Cap Fasteners - 4 x ¼ x 28 UNC Nylon • Utilization: 2% of Yield Strength • Torque Requirement: 1 (N-m) 10°

  7. Finite Element Analysis (FEA) • Quarter Model Hydrostatic Analysis • Boundary Conditions • Roller Side Boundaries • Fixed at Nose • Setup • Pressure: 60 kPa (~6m) • Mesh: 6mm curvature • Results • Limiting Safety Factor: 11.47 • Max Deflection: 35.2 µm MIN: 11.47 S.F.

  8. Motion Analysis: Flow3D • Conditions • Preset amount of ballast • Fully submerged • Still water • Exclude buoyancy control • Uniform density • Setup • Acceleration: 0.1 m/s2 downwards • Disp. Mass: 11.2 kg; Mass: 11.31 kg • Hollow body with point mass • Result: COG ~10mm below COB 4 ft 5.2 ft 2.8 ft

  9. Motion Analysis: Flow3D

  10. Control Codes • Speed Control Code • Varying thruster RPM • Depth Control Code • Maintain desired depth band • Roll & Pitch Code • Continual monitoring of roll and pitch • Potentiometer • Replicates sensor • Thruster • Replicates thruster • ± 2.5 V • Stepper Motor • Replicates Pump • Ballast Control

  11. Code Sequence + Φ - Φ + θ - θ Z1 + Z Z2

  12. Testing Methods • Static Commissioning • Water Tight Hull Test • External Ballast System Pressure Test • Dynamic Commissioning • Depth Driven Ballast Test • Rotation Driven Thrust Test • Pitch • Roll • Depth

  13. Deployment Strategies 1. Vertical Deployment • Propeller-down launch • Underwater • Avoid GBS interference 2. Horizontal Launch • Release bay filled with water • Exit from enclosed piping 3. Horizontal Docking • Connect with GBS 2. 1. 3.

  14. Moving Forward • Refine Flow3D Model using an upgraded version of Flow3D • Complete construction and fabrication • Continue optimizing control codes • Perform testing and analysis • Phase 3 Decision: • Develop general recommendations for full-scale implementation

  15. Questions? Thank-you www.lifesubengineering.weebly.com