100 likes | 228 Views
Submarine Evacuation System for Offshore Structures. Group Members: Ajanthan Asokan William Barkhouse Matthew Browne Stephen Handrigan. Client: Dr. Michael Hinchey. Agenda. Project Overview Problem Statement Strategy Current Progress Upcoming Milestones
E N D
Submarine Evacuation System for Offshore Structures Group Members: Ajanthan Asokan William Barkhouse Matthew Browne Stephen Handrigan Client: Dr. Michael Hinchey
Agenda • Project Overview • Problem Statement • Strategy • Current Progress • Upcoming Milestones • Presentation 2 Deliverables • Questions
Project Overview • Previous Incidents • Current Solutions • Outstanding Risks • Fire • Ice • Waves • Wind
Problem Statement • To provide a solution for evacuation of an offshore structure through the development of a fully-submersible vessel deployable from the topsides of an offshore structure
Strategy • Phase 1 • Prototype Development • Deployment Strategies • Phase 2 • Submarine Fabrication • Prototype Commissioning • Deployment Testing • Phase 3 • Option A: Preliminary Full-scale Design • Option B: Revisit Prototype Design
Current Progress – Phase 1 • Design of the prototype model • Structural Design • Mechanical Design • Electrical Design • Motion analysis – In Progress Circuit Board Thruster Stepper Motor Ballast Tank Battery
Upcoming Development- Phase 2 01. Submarine Fabrication • Dave Snook – Tech Services • Andrew Bazeley – Tecnadyne • Paul Sirois – Clark Solutions • Brian Pretty – Manufacturing Technology Centre 02. Prototype Verification • Michael Hinchey – Client 03. Deployment Method Testing • Leonard Lye – DOE Specialist
Presentation 2 Deliverables • Test analysis completed • Phase 3 Project Direction Finalized
Questions? Thank-you www.lifesubengineering.weebly.com