110 likes | 125 Views
This article presents the results and approaches of 31 working groups in inspection and enforcement. It covers inspection approach, enforcement approach, preparatory phase, proper control, follow-up variants, and more.
E N D
Inspection and enforcement approach Results of work 31 groups of inspectors from 10 RI CEI sremer@cizp.cz
Introduction • Results of work - 31 working groups • Inspection approach • Enforcement approach
Inspection approach • Preparatory phase • Proper control • Further variants of procedure • (Enforcement)
Preparatory phase • Inspector qualifications • Survey of pollution sources • Plan of control • Selection of subject • Documents for control
Proper control • Announced-unannounced • Preventive-integrated-multimedia • Control of documentation • Control of compliance on site • Sampling for documentation
Follow up variants of approach • Follow up procedure in relation to behavior of subject • Consideration of corrective measures-sanctions • …..
Enforcement approach • Preceeding steps • Initial phase • 1st soft variant of procedure • Second variant in frame of current law • 3rd „tight“ variant of procedure • Follow-up procedure
Soft variant • Warning of unsufficiency of compliance, date • of correction • Control of corrections • In case of non-compliance-sanction
Moderate variant in frame of current legislation • In case of not so important non-compliance • toimpose only symbolic penalty
Tight variant of procedure • Direct imposing of sanction
Follow up procedure • Follow up inspecption • tight variant in case of further non compliance