An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CRM: It’s More Than Just The Cockpit Frank Santoni Chief Pilot, Boeing Brooke Shindler Flight Test Analysis, Boeing Paul Bolds-Moorehead Principle S&C Engineer, Boeing Ralph Mohr Flight Test Safety, Boeing 5/9/07

  2. Agenda • Predictive Work Paul • Rehearsal Paul • Test Day Prep Ralph • Execution Frank • Test Conduct Brooke • Video Frank

  3. FAR Requirements • Vmcg – Minimum Control Ground Speed • Governed by FAR 25.149 (e) • It must be demonstrated that, when the critical engine is suddenly made inoperative at Vmcg during the takeoff roll, the airplane is safely controllable if the takeoff continued. • During the demonstration, the airplane must not deviate more than 30 ft.

  4. Test Preparation/Rehearsal • Extensive prediction of flight characteristics • Begins approx. one year before flight • Multiple variabilities examined for VMCG testing • Key factor: pilot reaction time (PRT) • Other factors: Crosswind, Initial Yaw Rate, Rudder Input Rate, Runway Condition, Hydraulic System Failures

  5. Test Preparation/Rehearsal • Factors/Trades:

  6. Test Preparation/Rehearsal • Team assigned early • Representatives from all disciplines (pilots, program engineering, test engineering) • Start early discussions on procedures and data metrics • Full team rehearses maneuver in engineering simulator • Fine tune test procedures • Establish abort criteria • Stated requirement that pilots involved in the test must practice in the simulator (part of risk alleviation)

  7. Test Preparation/Rehearsal

  8. Test Preparation/Rehearsal • Specific benefit example: 777-200LR / GE90-115BL VMCG test • Originally planned for light weight, Flaps 20 (as all previous 777’s had done) • “Conservative” build-up planned: start fast for less deviation, then fuel cuts at slower speeds until >30 ft lateral deviation achieved • Determined that airplane was basically airborne and rolling during simulator rehearsal • Test safety an issue !

  9. Test Preparation/Rehearsal • So…… the test plan was adjusted to Flaps 5, mid weight (after analytically showing insignificant effect on resulting VMCG speed) • Rather than traditional build-up, start testing AT predicted VMCG speed, then obtain points on either side to generate required data • Resulted in much safer test, successfully completed

  10. Test Director Roles • Test Planning • Coordinates with supporting groups • Flight Crew – Understands any crew comments or concerns • Analysis – Understands the test plan & requirements • Instrumentation – Data monitoring and preflight • Weights – Fuel & Ballast Loading Requirements • Ground Ops & Shop – Configuration, support, release time • Participates in rehearsals / dry-run simulator cab sessions • Develops team working together skills

  11. Test Director Roles • Test Sequencing • Risk Assessment • Risk Alleviation • Special Test Requirements • Sequence of Events / Procedures • Before APU Start •  Engine Shutdown

  12. Test Director Roles • Test Briefing • Test Crew • Wind Station Operator/Photo • Review Sequence • Discuss Lessons Learned • Discuss Technique • Discuss Monitoring Requirements • Discuss Knock-it-Off Criteria • Cabin Safety & Egress Brief • All participants required to be in attendance

  13. Test Director Roles • Test Conduct • Test Director responsible for ensuring team readiness • Comm Check – all the way around • Read & Do – run the procedure like a checklist • Initial Setup Engine Restart

  14. Test Director Roles • Test Conduct

  15. Test Director Roles • Post Test Debriefing • Discussion of events • Capturing lessons learned • Reporting • Operations Summary

  16. Test Conduct – Cockpit Brief • Align the airplane on runway – slight offset for wind • Receive condition card from Analysis • Brief condition • Call 100 kts • Cut speed – put “bug” on speed tape • Ignore engine surge • Pilot apply full rudder – when the nose moves • Knock it off call - review • Normally from back end when A/C cg turns around • If deviation is greater than 50 feet – 2 blocks (25 ft. each) • If data freezes • Pilot decides to • Review recovery procedure • Idle thrust • Control to parallel center line • Speedbrakes up • Max reverse • Brief when to put the nose wheel steering breakers back in • Check that team is ready

  17. Test Conduct • Conduct test • Get wind check CP from Windy • Call brake release P on test frequency • Add power slowly P • Track center line P • Feet off pedals prior to cut P • Non flying pilot cut fuel at cut speed CP • React to nose movement P • Full / rapid rudder application P • Condition over at knock it off call or at pilot discretion Analysis/CP/TD/P • Accomplish recovery procedure P • NWS circuit breakers in below 100 knots with pilot call CP/TD • Engine relight per briefed procedure CP/TD • Determine status of tires and brakes for cooling. P/CP/TD

  18. Roles and Responsibilities – Engineering • 3 Flight Test Engineers • ADAMS (Data) station • Overall responsibility for running the test in the back • Initial setup of data programs • Run trap • Monitor Lateral Deviation • Knock it off call

  19. Roles and Responsibilities – Engineering • Stripchart • Back up on knock it off • Makes quick condition qualities calls (reaction time and max deviation)

  20. Roles and Responsibilities – Engineering • Laptop • Works the spreadsheet to make post-condition calls • Takes notes

  21. Roles and Responsibilities – Engineering • Program Engineers • Provides intimate knowledge of trade studies and predictive work

  22. Decision Time! On test day everyone has a different level of conservatism. Everyone needs to come to next fuel cut decision as a group.

  23. Questions?