1 / 14

Materials Options (quality upgrade) will be available for the following at additional cost:

Floor : Ceramic (glazed, matt) Wall (Interior) : Acrylic (interior) Wall (Exterior) : Acrylic (Exterior) Wall (Accent) : Stone, burnt bricks, other) Ceiling : Plywood Doors : Hardwood, plywood

franz
Download Presentation

Materials Options (quality upgrade) will be available for the following at additional cost:

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Floor : Ceramic (glazed, matt) • Wall (Interior) : Acrylic (interior) • Wall (Exterior) : Acrylic (Exterior) • Wall (Accent) : Stone, burnt bricks, other) • Ceiling : Plywood • Doors : Hardwood, plywood • Windows : PVC framed sliding glass • Kitchen Cabinets • (Floor /Wall mounted) : Veneered compressed board • Kitchen cabinet (top) : Laminated pressed board • Light Fixtures : Decorative fluorescent & • incandescent • Yard Pavement (Parking • & Walkways) : Interlocking concrete blocks • Landscaping : Hard wearing grass, shrubs, • flowering plants • Fence : Masonry with decorative • screen blocks. • Purchasing options & terms • Buyer finances construction in three installments over construction period: 30% down; 45% at roof level; 25% at handover of keys. • Buyer finances construction from mortgage loan obtained from local bank (arrangements in process). Payment installments, as above. • Steps to purchase • Complete filling in and submit application form • Fill in (or complete) Home Buyer Information Sheet in consultation with Agented Premier Developer’s office. • Enter into Sales Agreement with Premier Developer JV, Inc. • Make down payment. • Follow-up construction progress and make progress payments. • Receive completed home at hand over. • Report post-construction defects and have them corrected. • Construction Duration • Bungalows: 8 calendar months. • Town Houses (2 storey's): 9 calendar months. • Estate Management • Management of the estate affairs, to include security, garbage disposal, cleaning, landscaping. Attendance to utility services will be handled by a Home owner’s Estate Management Body run by the Home Owners of the Estate. • Materials Options (quality upgrade) will be available for the following at additional cost: • Floor • Ceiling • Doors • Kitchen Cabinets (Floor and Wall mounted) • Kitchen cabinet (top) • Light Fixtures

  2. A LIFE STYLE OF QUALITY & COMFORT PREMIER HOMES DEVELOPER PREMIER HOMES Front Street – 3rd. Floor, Dillon Building Monrovia,Liberia Tel.: 0880689984/076203472 Email: info@premierhomesliberia.com Web:www.premierhomesliberia.com

  3. Floor : Ceramic (glazed, matt) • Wall (Interior) : Acrylic (interior) • Wall (Exterior) : Acrylic (Exterior) • Wall (Accent) : Stone, burnt bricks, other) • Ceiling : Plywood • Doors : Hardwood, plywood • Windows : PVC framed sliding glass • Kitchen Cabinets • (Floor /Wall mounted) : Veneered compressed board • Kitchen cabinet (top) : Laminated pressed board • Light Fixtures : Decorative fluorescent & • incandescent • Yard Pavement (Parking • & Walkways) : Interlocking concrete blocks • Landscaping : Hard wearing grass, shrubs, • flowering plants • Fence : Masonry with decorative • screen blocks. • Purchasing options & terms • Buyer finances construction in three installments over construction period: 30% down; 45% at roof level; 25% at handover of keys. • Buyer finances construction from mortgage loan obtained from local bank (arrangements in process). Payment installments, as above. • Steps to purchase • Complete filling in and submit application form • Fill in (or complete) Home Buyer Information Sheet in consultation with Agented Premier Developer’s office. • Enter into Sales Agreement with Premier Developer JV, Inc. • Make down payment. • Follow-up construction progress and make progress payments. • Receive completed home at hand over. • Report post-construction defects and have them corrected. • Construction Duration • Bungalows: 8 calendar months. • Town Houses (2 storey's): 9 calendar months. • Estate Management • Management of the estate affairs, to include security, garbage disposal, cleaning, landscaping. Attendance to utility services will be handled by a Home owner’s Estate Management Body run by the Home Owners of the Estate. • Materials Options (quality upgrade) will be available for the following at additional cost: • Floor • Ceiling • Doors • Kitchen Cabinets (Floor and Wall mounted) • Kitchen cabinet (top) • Light Fixtures

  4. A LIFE STYLE OF QUALITY & COMFORT PREMIER HOMES DEVELOPER PREMIER HOMES Front Street – 3rd. Floor, Dillon Building Monrovia,Liberia Tel.: 0880689984/076203472 Email: info@premierhomesliberia.com Web:www.premierhomesliberia.com

  5. Floor : Ceramic (glazed, matt) • Wall (Interior) : Acrylic (interior) • Wall (Exterior) : Acrylic (Exterior) • Wall (Accent) : Stone, burnt bricks, other) • Ceiling : Plywood • Doors : Hardwood, plywood • Windows : PVC framed sliding glass • Kitchen Cabinets • (Floor /Wall mounted) : Veneered compressed board • Kitchen cabinet (top) : Laminated pressed board • Light Fixtures : Decorative fluorescent & • incandescent • Yard Pavement (Parking • & Walkways) : Interlocking concrete blocks • Landscaping : Hard wearing grass, shrubs, • flowering plants • Fence : Masonry with decorative • screen blocks. • Purchasing options & terms • Buyer finances construction in three installments over construction period: 30% down; 45% at roof level; 25% at handover of keys. • Buyer finances construction from mortgage loan obtained from local bank (arrangements in process). Payment installments, as above. • Steps to purchase • Complete filling in and submit application form • Fill in (or complete) Home Buyer Information Sheet in consultation with Agented Premier Developer’s office. • Enter into Sales Agreement with Premier Developer JV, Inc. • Make down payment. • Follow-up construction progress and make progress payments. • Receive completed home at hand over. • Report post-construction defects and have them corrected. • Construction Duration • Bungalows: 8 calendar months. • Town Houses (2 storey's): 9 calendar months. • Estate Management • Management of the estate affairs, to include security, garbage disposal, cleaning, landscaping. Attendance to utility services will be handled by a Home owner’s Estate Management Body run by the Home Owners of the Estate. • Materials Options (quality upgrade) will be available for the following at additional cost: • Floor • Ceiling • Doors • Kitchen Cabinets (Floor and Wall mounted) • Kitchen cabinet (top) • Light Fixtures

  6. A LIFE STYLE OF QUALITY & COMFORT PREMIER HOMES DEVELOPER PREMIER HOMES Front Street – 3rd. Floor, Dillon Building Monrovia,Liberia Tel.: 0880689984/076203472 Email: info@premierhomesliberia.com Web:www.premierhomesliberia.com

  7. Floor : Ceramic (glazed, matt) • Wall (Interior) : Acrylic (interior) • Wall (Exterior) : Acrylic (Exterior) • Wall (Accent) : Stone, burnt bricks, other) • Ceiling : Plywood • Doors : Hardwood, plywood • Windows : PVC framed sliding glass • Kitchen Cabinets • (Floor /Wall mounted) : Veneered compressed board • Kitchen cabinet (top) : Laminated pressed board • Light Fixtures : Decorative fluorescent & • incandescent • Yard Pavement (Parking • & Walkways) : Interlocking concrete blocks • Landscaping : Hard wearing grass, shrubs, • flowering plants • Fence : Masonry with decorative • screen blocks. • Purchasing options & terms • Buyer finances construction in three installments over construction period: 30% down; 45% at roof level; 25% at handover of keys. • Buyer finances construction from mortgage loan obtained from local bank (arrangements in process). Payment installments, as above. • Steps to purchase • Complete filling in and submit application form • Fill in (or complete) Home Buyer Information Sheet in consultation with Agented Premier Developer’s office. • Enter into Sales Agreement with Premier Developer JV, Inc. • Make down payment. • Follow-up construction progress and make progress payments. • Receive completed home at hand over. • Report post-construction defects and have them corrected. • Construction Duration • Bungalows: 8 calendar months. • Town Houses (2 storey's): 9 calendar months. • Estate Management • Management of the estate affairs, to include security, garbage disposal, cleaning, landscaping. Attendance to utility services will be handled by a Home owner’s Estate Management Body run by the Home Owners of the Estate. • Materials Options (quality upgrade) will be available for the following at additional cost: • Floor • Ceiling • Doors • Kitchen Cabinets (Floor and Wall mounted) • Kitchen cabinet (top) • Light Fixtures

  8. A LIFE STYLE OF QUALITY & COMFORT PREMIER HOMES DEVELOPER PREMIER HOMES Front Street – 3rd. Floor, Dillon Building Monrovia,Liberia Tel.: 0880689984/076203472 Email: info@premierhomesliberia.com Web:www.premierhomesliberia.com

  9. Floor : Ceramic (glazed, matt) • Wall (Interior) : Acrylic (interior) • Wall (Exterior) : Acrylic (Exterior) • Wall (Accent) : Stone, burnt bricks, other) • Ceiling : Plywood • Doors : Hardwood, plywood • Windows : PVC framed sliding glass • Kitchen Cabinets • (Floor /Wall mounted) : Veneered compressed board • Kitchen cabinet (top) : Laminated pressed board • Light Fixtures : Decorative fluorescent & • incandescent • Yard Pavement (Parking • & Walkways) : Interlocking concrete blocks • Landscaping : Hard wearing grass, shrubs, • flowering plants • Fence : Masonry with decorative • screen blocks. • Purchasing options & terms • Buyer finances construction in three installments over construction period: 30% down; 45% at roof level; 25% at handover of keys. • Buyer finances construction from mortgage loan obtained from local bank (arrangements in process). Payment installments, as above. • Steps to purchase • Complete filling in and submit application form • Fill in (or complete) Home Buyer Information Sheet in consultation with Agented Premier Developer’s office. • Enter into Sales Agreement with Premier Developer JV, Inc. • Make down payment. • Follow-up construction progress and make progress payments. • Receive completed home at hand over. • Report post-construction defects and have them corrected. • Construction Duration • Bungalows: 8 calendar months. • Town Houses (2 storey's): 9 calendar months. • Estate Management • Management of the estate affairs, to include security, garbage disposal, cleaning, landscaping. Attendance to utility services will be handled by a Home owner’s Estate Management Body run by the Home Owners of the Estate. • Materials Options (quality upgrade) will be available for the following at additional cost: • Floor • Ceiling • Doors • Kitchen Cabinets (Floor and Wall mounted) • Kitchen cabinet (top) • Light Fixtures

  10. A LIFE STYLE OF QUALITY & COMFORT PREMIER HOMES DEVELOPER PREMIER HOMES Front Street – 3rd. Floor, Dillon Building Monrovia,Liberia Tel.: 0880689984/076203472 Email: info@premierhomesliberia.com Web:www.premierhomesliberia.com

  11. Floor : Ceramic (glazed, matt) • Wall (Interior) : Acrylic (interior) • Wall (Exterior) : Acrylic (Exterior) • Wall (Accent) : Stone, burnt bricks, other) • Ceiling : Plywood • Doors : Hardwood, plywood • Windows : PVC framed sliding glass • Kitchen Cabinets • (Floor /Wall mounted) : Veneered compressed board • Kitchen cabinet (top) : Laminated pressed board • Light Fixtures : Decorative fluorescent & • incandescent • Yard Pavement (Parking • & Walkways) : Interlocking concrete blocks • Landscaping : Hard wearing grass, shrubs, • flowering plants • Fence : Masonry with decorative • screen blocks. • Purchasing options & terms • Buyer finances construction in three installments over construction period: 30% down; 45% at roof level; 25% at handover of keys. • Buyer finances construction from mortgage loan obtained from local bank (arrangements in process). Payment installments, as above. • Steps to purchase • Complete filling in and submit application form • Fill in (or complete) Home Buyer Information Sheet in consultation with Agented Premier Developer’s office. • Enter into Sales Agreement with Premier Developer JV, Inc. • Make down payment. • Follow-up construction progress and make progress payments. • Receive completed home at hand over. • Report post-construction defects and have them corrected. • Construction Duration • Bungalows: 8 calendar months. • Town Houses (2 storey's): 9 calendar months. • Estate Management • Management of the estate affairs, to include security, garbage disposal, cleaning, landscaping. Attendance to utility services will be handled by a Home owner’s Estate Management Body run by the Home Owners of the Estate. • Materials Options (quality upgrade) will be available for the following at additional cost: • Floor • Ceiling • Doors • Kitchen Cabinets (Floor and Wall mounted) • Kitchen cabinet (top) • Light Fixtures

  12. PREMIER HOMES DEVELOPER PREMIER HOMES Front Street – 3rd. Floor, Dillon Building Monrovia,Liberia Tel.: 0880689984/076203472 Email: info@premierhomesliberia.com Web:www.premierhomesliberia.com

  13. Floor : Ceramic (glazed, matt) • Wall (Interior) : Acrylic (interior) • Wall (Exterior) : Acrylic (Exterior) • Wall (Accent) : Stone, burnt bricks, other) • Ceiling : Plywood • Doors : Hardwood, plywood • Windows : PVC framed sliding glass • Kitchen Cabinets • (Floor /Wall mounted) : Veneered compressed board • Kitchen cabinet (top) : Laminated pressed board • Light Fixtures : Decorative fluorescent & • incandescent • Yard Pavement (Parking • & Walkways) : Interlocking concrete blocks • Landscaping : Hard wearing grass, shrubs, • flowering plants • Fence : Masonry with decorative • screen blocks. • Purchasing options & terms • Buyer finances construction in three installments over construction period: 30% down; 45% at roof level; 25% at handover of keys. • Buyer finances construction from mortgage loan obtained from local bank (arrangements in process). Payment installments, as above. • Steps to purchase • Complete filling in and submit application form • Fill in (or complete) Home Buyer Information Sheet in consultation with Agented Premier Developer’s office. • Enter into Sales Agreement with Premier Developer JV, Inc. • Make down payment. • Follow-up construction progress and make progress payments. • Receive completed home at hand over. • Report post-construction defects and have them corrected. • Construction Duration • Bungalows: 8 calendar months. • Town Houses (2 storey's): 9 calendar months. • Estate Management • Management of the estate affairs, to include security, garbage disposal, cleaning, landscaping. Attendance to utility services will be handled by a Home owner’s Estate Management Body run by the Home Owners of the Estate. • Materials Options (quality upgrade) will be available for the following at additional cost: • Floor • Ceiling • Doors • Kitchen Cabinets (Floor and Wall mounted) • Kitchen cabinet (top) • Light Fixtures

  14. PREMIER HOMES DEVELOPER PREMIER HOMES Front Street – 3rd. Floor, Dillon Building Monrovia,Liberia Tel.: 0880689984/076203472 Email: info@premierhomesliberia.com Web:www.premierhomesliberia.com

More Related