An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Brazil Supplier’s Visit Schedule João Santos Supply Chain Manager

  2. Agenda Jul/12th to Jul/16th – 16 Suppliers Scheduled

  3. IFER Commodity: Stampings

  4. IFER Commodity: Stampings Current Stampings Production Process Control Equipment

  5. DEBONY Commodity: Machining

  6. DEBONY Commodity: Machining Current Machining Production Machines Process Control Equipment

  7. JOALMI Commodity: Stampings

  8. JOALMI Commodity: Stampings Current Stampings Production Process Control Equipment

  9. DELUMA Commodity: Aluminum Die Casting

  10. DELUMA Commodity: Aluminum Die Casting No Pictures Available

  11. ALUMEC Commodity: Aluminum Die Casting

  12. ALUMEC Commodity: Aluminum Die Casting Current Aluminum Die Casting Production Process Control Equipment

  13. PICHININ Commodity: Aluminum Die Casting * Expected for the next 3 years

  14. PICHININ Commodity: Aluminum Die Casting Current Aluminum Die Casting Production Process Control Equipment

  15. METALURGICA MARDEL Commodity: Stampings * Expected for the next 3 years

  16. METALURGICA MARDEL Commodity: Stampings Current Stamping Production

  17. OURO FINO Commodity: Stampings

  18. OURO FINO Commodity: Stampings Current Stamping Production Process Control Equipment

  19. Component Commodity: Plastic Injection * Expected for the next 3 years

  20. Component Commodity: Plastic Injection Current Plastic Injection Production Process Control Equipment

  21. ZanettiniBarossi Commodity: Stamping & Plastic Injection * Expected for the next 3 years

  22. ZanettiniBarossi Commodity: Current Production

  23. A KALMAN MET. KALINDUS Commodity: Aluminum Die Casting * Expected for the next 3 years

  24. A KALMAN MET. KALINDUS Commodity: Aluminum Die Casting Current Aluminum Die Casting Production Process Control Equipment

  25. LANMAR Commodity: Machining

  26. LANMAR Commodity: Machining Process Control Equipment

  27. ASVOTEC Commodity: Machining * Expected for the next 3 years

  28. ASVOTEC Commodity: Machining Current Machining Production Process Control Equipment

  29. SULBRAS Commodity: Plastic Injection

  30. SULBRAS Commodity: Plastic Injection Current Machining Production Process Control Equipment

  31. USITEC Commodity: Machining

  32. USITEC Commodity: Machining Current Machining Production Process Control Equipment

  33. ERNANDES Commodity: Machining

  34. ERNANDES Commodity: Machining Process Control Equipment