TC meeting P2 planning wks 9&10. A.Tauro 28-2-2012. Planning wk9. DSO test: no access UX25 on Thu 1 st Mar (and on 2 nd , as a reserve) PH -DT (gas-group): upgrade of the PLC and PVSS codes. The intervention will last about 8 hours Mon 27th TPC laser (start on Wed PM)
E N D
TC meetingP2 planning wks 9&10 A.Tauro 28-2-2012
Planning wk9 • DSO test: no access UX25 on Thu 1st Mar (and on 2nd, as a reserve) • PH-DT (gas-group): upgrade of the PLC and PVSS codes. The intervention will last about 8 hours • Mon 27th • TPC laser (start on Wed PM) • SPD cooling drill SR7 on Mon • Transport + P2tech: • PX24 plug (small blocks, Mon) • Close hole in MNF shielding (Tue) • Restart L3 and Dipole cooling (test on Tue between 10:00 and 12:00) • Removal A.C. from CR2 (Thu) • MTG: restart isobuthane (Tue) • HMP: restart methane (Tue) • Muon TRK: • Repair slats on ST3-ST4-ST5 • BE-ABP-SU: survey ST3-4-5 and network measurement with new instrument. Scan L3+MNF from low-beta (if possible) • EN-CV: install and commissioning new PMD ventilator unit • EN-CV-DC: finalize TPC-RR filters installation and SSD-SDD ramp-up TC meeting - A.Tauro
Planning wk10 • SPD cooling • P2tech: reinstall green fences C-side • Muon TRK: • Repair slats on ST3-ST4-ST5 • Move PMD to final position (Mon) • Reinstall ADA • BE-ABP-SU: PMD survey (Tue) • EN-HE: removal crane electronics (Fri) • EN-CV-BE: start-up and commissioning new ITS dehumidifier (5th Mar) • TE-VSC: open manual valve in MNF (Fri) • T0: check electronics (9 to 12/3) • ONET: cleaning UX25 cavern • INEO: install 220V sockets in backframe (Tue) and miniframe (Wed) TC meeting - A.Tauro
AOB • Confined training course tomorrow, Wednesday, at 9:00 at P2 • See with Fernando if you are interested to follow the course TC meeting - A.Tauro