TC meeting P2 planning wks 9&10

TC meeting P2 planning wks 9&10. A.Tauro 28-2-2012. Planning wk9. DSO test: no access UX25 on Thu 1 st Mar (and on 2 nd , as a reserve) PH -DT (gas-group): upgrade of the PLC and PVSS codes. The intervention will last about 8 hours Mon 27th TPC laser (start on Wed PM)

freja
Download Presentation

TC meeting P2 planning wks 9&10

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TC meetingP2 planning wks 9&10 A.Tauro 28-2-2012

  2. Planning wk9 • DSO test: no access UX25 on Thu 1st Mar (and on 2nd, as a reserve) • PH-DT (gas-group): upgrade of the PLC and PVSS codes. The intervention will last about 8 hours • Mon 27th • TPC laser (start on Wed PM) • SPD cooling  drill SR7 on Mon • Transport + P2tech: • PX24 plug (small blocks, Mon) • Close hole in MNF shielding (Tue) • Restart L3 and Dipole cooling (test on Tue between 10:00 and 12:00) • Removal A.C. from CR2 (Thu) • MTG: restart isobuthane (Tue) • HMP: restart methane (Tue) • Muon TRK: • Repair slats on ST3-ST4-ST5 • BE-ABP-SU: survey ST3-4-5 and network measurement with new instrument. Scan L3+MNF from low-beta (if possible) • EN-CV: install and commissioning new PMD ventilator unit • EN-CV-DC: finalize TPC-RR filters installation and SSD-SDD ramp-up TC meeting - A.Tauro

  3. Planning wk10 • SPD cooling • P2tech: reinstall green fences C-side • Muon TRK: • Repair slats on ST3-ST4-ST5 • Move PMD to final position (Mon) • Reinstall ADA • BE-ABP-SU: PMD survey (Tue) • EN-HE: removal crane electronics (Fri) • EN-CV-BE: start-up and commissioning new ITS dehumidifier (5th Mar) • TE-VSC: open manual valve in MNF (Fri) • T0: check electronics (9 to 12/3) • ONET: cleaning UX25 cavern • INEO: install 220V sockets in backframe (Tue) and miniframe (Wed) TC meeting - A.Tauro

  4. AOB • Confined training course tomorrow, Wednesday, at 9:00 at P2 • See with Fernando if you are interested to follow the course TC meeting - A.Tauro