1 / 33

Oil & Gas Operations

Oil & Gas Operations. Marzo 10, 2012. Customer Example. ConocoPhillips North Sea Ekofisk Asset. ConocoPhillips North Sea. ConocoPhillips leveraged their existing investment in the OSIsoft PI System and Microsoft Technology to provide the important real-time infrastructure enabling:

Download Presentation

Oil & Gas Operations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Oil & Gas Operations Marzo 10, 2012

  2. Customer Example ConocoPhillips North Sea Ekofisk Asset

  3. ConocoPhillips North Sea ConocoPhillips leveraged their existing investment in the OSIsoft PI System and Microsoft Technology to provide the important real-time infrastructure enabling: • Collaboration between onshore and offshore operations • The achievement of production, maintenance, and efficiency targets • Automated real-time warnings on condition monitors and alerts which has led to proactive tasks instead of reactive actions • Increased field production

  4. ConocoPhillips North Sea It took less than six months to implement, by keeping documentation and scope simple, and focusing on the following key functionality goals: • Real-time collaboration between onshore and offshore • Real-time data updates in a browser for all to observe • Web-based comments/annotations/ RT Messaging • Consolidated alerting / notification • Integrated and contextual views of equipment data • Short Interval Control (SIC process) with systematic communication between the offshore operators and the onshore engineers

  5. Role Based Home Page

  6. Real-time data updates in a browser for all to observe

  7. Consolidated alerting / notification

  8. Consolidated alerting / notification: drill down

  9. Customer Example Marathon E&P

  10. Brownfield Production Optimization • Large number of gas wells • Spread out across numerous counties in Texas • Wanted to optimize production from brownfield sites • Focused on well performance monitoring and plunger operations • 6 month project leveraging the real-time infrastructure

  11. Seven Day Status of All Wells

  12. Seven Day Status of Individual Well

  13. Well Status at the Time of the Last Error

  14. Exporting Well Errors to Excel

  15. Resulting Spreadsheet

  16. Customer Example TOTAL E&P

  17. TOTAL Field Monitoring Project The challenge is to increase the field performance by: • Maximizing production and reserves • Managing them more efficiently The objective is to optimize the monitoring techniques in field management, via a transverse approach of E&P activities and job functions, from reservoir to export terminals. This will mainly be achieved through the development of : • collaborative tools to optimize monitoring performance • an agile IT Architecture to facilitate information sharing, based on IT standards

  18. Production Monitoring - On Site Demonstrations Congo Congo Sendji Argentina Cañadon Alfa Angola Girassol Rosa Jasmim WPM – GL WPM – SUBSEA WPM – ESP PPM – RE

  19. Well Performance Monitoring – Alarms Visualization – “Multi-Alarm” tab

  20. PPM – Performance Curves & KPIs

  21. Customer Example of Webpage

  22. Customer Examples

  23. Well Test Validation Dashboard

  24. Proactive Dashboards:The Power to Generate Knowledge By Rayan Hafiz Saudi Arabian Oil Company Presented by: Craig Harclerode Business Development Executive, O&G OSIsoft, LLC

  25. OSIsoft at Saudi Aramco • Largest user of PI and OSIsoft products in the Middle East • First agreement was signed in 1996 • Approximately 105 PI servers • Utilizing about 1.7 million PI tags. • 2500+ of PI clients • PI-ProcessBook • PI-DataLink • PI-WebParts

  26. Remote PI Servers PLC DCS DCS SCADA PLC (Instrumentation) Data Flow Corporate Dashboards Corporate SAP & other data SCADA Central PI Servers Remote Sites Remote Terminal Units (RTU)

  27. Kuwait Saudi Aramco PI Sites Arabian Gulf Doha Riyadh Jeddah The Red Sea

  28. Detailed Monitoring

  29. Predictive Model Implementation

  30. The Dashboard

  31. The Dashboard

  32. VIDEO ILUSTRATIVO EN EL AREA DE EXPLOTACION Y PRODUCCION

More Related