An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Future of European ISOL Peter Butler Coseners meeting Sept 10-11 2008

  2. ISOL in Europe CRC, Louvain-la-Neuve ( 1989-2008) SPIRAL, GANIL (2001) DRIBS, Dubna REX-ISOLDE, CERN ( 2001) EXCYT, Catania (2006) Coseners meeting Sept 10-11 2008

  3. World ISOL Coseners meeting Sept 10-11 2008

  4. Next generation ISOL facilities in Europe SPIRAL II EURISOL SPES HIE-ISOLDE Coseners meeting Sept 10-11 2008

  5. HIE-ISOLDE CERN HIE-LINAC RFQ Existing IH-structure Existing 7 & 9-gap high-b high-b high-b high-b 300 keV 1.2 MeV/u 2.8 MeV/u 4.5 MeV/u 6 MeV/u 8 MeV/u 10 MeV/u low-b low-b cavity low-b solenoid diagnostic box high-b Coseners meeting Sept 10-11 2008

  6. HIE-ISOLDE timeline Solid state RILIS is now installed RFQ cooler (ISCOOL) ready for exploitation SC LINAC 10 MeV/u construction 2009-2013 EBIS, new RFQ Cooler, HRS upgrade 2011-2013 HIGH-POWER TARGET UPGRADE 2011-2015 Coseners meeting Sept 10-11 2008

  7. SPIRAL-2 GANIL GANIL/SPIRAL 1 today CIME cyclotron RIB at 1-20 AMeV (up to 9 AMeV for ff) DESIR Facility low energy RIB Fission Production Cave Up to 1014fiss./sec. Phase 2 HRS+RFQ Cooler Production Cave for other beams Transfer, fusion-evap, A/q=3 HI source Up to 1mA LINAC Phase 1 AEL High intensity stable HI beams up to 14.5 A MeV A/q=6 Injector option A/q=2 source p, d, 3,4He 5mA

  8. RIB production SPIRAL-2 DESIR Coseners meeting Sept 10-11 2008

  9. Coseners meeting Sept 10-11 2008

  10. SPES LEGNARO Coseners meeting Sept 10-11 2008

  11. SPES UCx target 40 MeV p driver Coseners meeting Sept 10-11 2008

  12. EURISOL: GANIL? CIME would be replaced by a 100 MeV/u postaccelerator

  13. EURISOL: CERN? Coseners meeting Sept 10-11 2008

  14. Low Power SPL (CERN) (1.4 GeV 50 kW to HIE-ISOLDE) High Power SPL (CERN) (1.4 GeV 3 MW to EUR-ISOLDE) Earliest 2020 Coseners meeting Sept 10-11 2008

  15. EURISOL SITE COMPARISON COMMITTEE Alan Shotter (chair) Alex Mueller (IN2P3) Giacomo Cottone (INFN) Don Geesaman (ANL) Steve Myers (CERN) CERN, RAL, Legnaro, GANIL EURISOL Users Group Angela Bonacorrso (Italy, chair) Dieter Ackermann (Germany), Bertram Blank (France), Giacomo De Angelis (Italy), Ari Jokinen (Finland), Marek Lewitowicz (France), Robert Page (UK), Berta Rubio (Spain), Michael Thoennessen (USA) Coseners meeting Sept 10-11 2008

  16. FINIS Coseners meeting Sept 10-11 2008