1 / 23

EURISOL (and the European ISOL roadmap)

EURISOL (and the European ISOL roadmap). Yorick Blumenfeld* (CERN) *on leave from IPN Orsay. OUTLINE. The Framework General Physics Case The “Intermediate Generation” Facilities Results of the EURISOL Design Study Future Initiatives. The Framework.

sagira
Download Presentation

EURISOL (and the European ISOL roadmap)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EURISOL (and the European ISOL roadmap) Yorick Blumenfeld* (CERN) *on leave from IPN Orsay

  2. OUTLINE • The Framework • General Physics Case • The “Intermediate Generation” Facilities • Results of the EURISOL Design Study • Future Initiatives

  3. The Framework • Radioactive Ion (Rare Isotope) Beams have transformed the landscape of Nuclear Structure over the last quarter century. • Major discoveries have revealed unforeseen behaviors of the nucleus • Understanding of the nucleus requires a multifaceted approach • Low intensities are the major impediments to further progress • Fragmentation and ISOL facilities are complementary and should be developed in parallel

  4. The Nuclear Chart and Challenges

  5. Radioactive beam production: Two complementary methods IN FLIGHT SELECTION GANIL/SISSI, GSI, RIKEN, NSCL/MSU High energy, large variety of species, Poor optical qualities GANIL/SPIRAL, REX/ISOLDE, ISAAC/TRIUMF Low energy, chemistry is difficult, good beam qualities

  6. The Previous LRP NuPECC recommends the construction of 2 ‘next generation’ RIB infrastructures in Europe, i.e. one ISOL and one in-flight facility. The in-flight machine would arise from a major upgrade of the current GSI facility: FAIR, while EURISOL would constitute the new ISOL facility The Current European Situation • Construction of intermediate generation facilities: SPIRAL2, HIE-ISOLDE, SPES and of FAIR has begun or is about to begin. • Design and prototyping of the most specific and challenging parts of EURISOL has been carried out in the framework of EURISOL_DS. • EURISOL must go beyond FAIR and offer the best of both worlds : ISOL and Fragmentation

  7. ISOL Roadmap in EUROPE TODAY SPIRAL – LNS - EXCYT 2014-2025 FROM 2025

  8. LINAG Exp. Area (AEL) Existing GANIL Accelerators Direct beam line CIME-G1/G2 caves Existing GANIL Exp. Area Heavy-Ion ECR Low energy RNB DESIR CIME Cyclotron Acceleration of RI Beams E < 25 AMeV, 1 - 8 AMeV for FF • Production Caves:: RNB • C converter+UCx target • 1014 fissions/s • p- & n-rich RNB (transfer, fusion-evaporation, DIC) p,d source RFQ • Superconducting LINAC: Stable-Ion beams • E ≤ 14.5 AMeV HI A/q=3, 1mA • E ≤ 20 A MeV p,d, 4He (A/q=2 ions), 5mA • Possible extension to A/q=6 ions

  9. Aims of the HIE-ISOLDE upgrade • Intensity : Linac 4 @CERN • Energy from 3 to 10A MeV • Coulex for all RIB • Transfer reactions • Efficiency low energy + accelerated • Selectivity • Beam “quality” • Reduced phase space • Bunching • Polarization ..... EURORIB’08, Giens, June 9-13

  10. SC linac Max energy for different A/q : M. Pasini EURORIB’08, Giens, June 9-13

  11. The SPES Project @ LNL: a multi-user project High intensity proton linac: TRIPS source - TRASCO RFQ 30 mA, 5MeV Neutron facility for Medical, Astrophysics and Material science. Neutron source up to 1014 n s-1 Thermal neutrons: 109 n s-1 cm-2 ISOL Beam Facility for nuclear Physics Approved for construction Applied Physics with proton beam 70 MeV 550 mA (possible upgrade up to 1mA) Production Target: UCx1013 fission s-1 Primary Beam: 200 mA,40 MeV protons from a 2 exit ports Cyclotron (750 mA,70 MeV ) Re-accelerator: ALPISuperconductive Linac up to 11 AMeV for A=130

  12. EURISOL DS: 20 Participants 4 1/2 years; 30 M Euros

  13. What is EURISOL?

  14. 1 GeV/q H-, H+, 3He++ n-generator UCx target H- HWRs 176MHz Elliptical ISCL 704 MHz 3-spoke ISCL 325 MHz Elliptical ISCL 704 MHz RFQ 176 MHz 4-MW target station b = 0.03 b = 0.047 b = 0.65 b = 0.78 b = 0.09, b = 0.15 100 keV 1+ ion source 1.5 MeV/u 60 MeV/q 140 MeV/q H+, D+, 3He++ >200 MeV/q D+, A/q=2 Ion sources A possible schematic layout for a EURISOL facility One of several 100-kW direct target stations Low-resolution mass-selector Secondary fragmentation target Spoke ISCL 264 MHz 8 HWRs ISCL 176 MHz 3 QWRs ISCL 88 MHz QWR ISCL 88 MHz Charge selector Bunching RFQ RFQs High-resolution mass-selector Charge breeder b = 0.385 b = 0.27 b = 0.14 b = 0.065 20-150 MeV/u (for 132Sn) 9.3- 62.5 MeV/u 2.1-19.9 MeV/u To high-energy experimental areas To low-energy areas To medium-energy experimental areas

  15. EURISOL Target Building

  16. EURISOL MMW Targets

  17. Spoke cavity development @ IPN Orsay • 2 prototypes at =0.15 and =0.35 fabricated and successfully tested at 4.2 K. • This technology is the basis for the 3-Spoke required by the Driver linac Spoke cavity tuner EURISOL Task 8: Sébastien Bousson – IPN Orsay

  18. Secondary Fragmentation of a 132Sn beam Cross Sections measured at GSI

  19. Secondary Fragmentation of 132Sn at 150A MeV

  20. LNL Legnaro CERN RUTHEFORD GANIL

  21. Timescale for EURISOL • 2010-2012 : Transition period; contacts with funding agencies and political bodies • 2012 : Application to be included in ESFRI list (support from NuPECC & LRP necessary) • 2013 : Call for preparatory phase • 2014-2017 : EURISOL Preparatory Phase • 2017 : Choice of Location • 2017-2019 : Preparation of TDR • 2020-2025 : Construction • 2025 : First Beam

  22. The “Transition” Period (2010-2013) • The EURISOL project office • The EURISOL collaboration: (MOU between all laboratories interested in furthering EURISOL; in preparation) • The EURISOL User Group (Established with elected executive committee; will federate scientific community and update physics case; A. Bonaccorso, chair ) • The EURISOL Network in ENSAR (included in ENSAR application; will coordinate EURISOL focused R&D at current facilities and fund Town Meetings; 150 KE; leader Y. Blumenfeld) • The EURISOL work package in TIARA : (included in TIARA application; Define and Prepare R&D platforms for EURISOL; up to 500 KE; leader S. Bousson – Orsay) • Requests to NuPNET for pan-European funded R&D through national funding agencies (approx 1ME each – at most 1 to be funded) • Liquid metal target tests • Beam splitter • ECRIS beam merger • EC support for global projects: Possibility of EC support up to 1 ME to expand EURISOL into a global (worldwide) project; suggestion from Brussels still to be investigated.

  23. Conclusions • Major RIB developments are proceeding worldwide (FRIB, TRIUMF, RIKEN, KoRIA…) and competition will be fierce. • The LRP must propose an ambitious roadmap to maintain and strengthen Europe’s leadership in the field • This plan should be based on FAIR and the “intermediate” ISOL facilities (SPIRAL2, HIE-ISOLDE, SPES) in the near term, and EURISOL in the longer term.

More Related