Dump Heating Temperature (revision 2_ part 1)

Dump Heating Temperature (revision 2_ part 1). Ang Lee March 16, 2010. FEA Model. Material Property. Kxx (W/ mK ) Cp(J/ kgK ) density (kg/m^3) Copper 383 385 8900 Steel 44 470 7800 Concrete 0.91 961 2300. Geometry and Loading. Given by Fernanda G/Larry A./Rob R as shown Fig 1.

frisco
Download Presentation

Dump Heating Temperature (revision 2_ part 1)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Dump Heating Temperature(revision 2_ part 1) Ang Lee March 16, 2010

  2. FEA Model

  3. Material Property Kxx(W/mK) Cp(J/kgK) density (kg/m^3) Copper 383 385 8900 Steel 44 470 7800 Concrete 0.91 961 2300

  4. Geometry and Loading • Given by Fernanda G/Larry A./Rob R as shown Fig 1. • 9hz@10 usec@400 Mev@35 mA1.26 KW • 15 Hz@4usec@400 Mev@35mA-->0.84KW • Beam spot =24 cmx4 cmx1” as well as 12 cmx4 cm x 1” (* Provided by L. Allen & F. Garcia) • Top plate is 1 inch thick copper. • The copper tube is 0.25” thick. • Surrounding Steel is ~36” in diameter & 108” in length and 33” thick concrete. • The boundary condition for the outer surface of the concrete is assuming to be natural convection with hc=~5 W*m^2*K

  5. Slice from earlier result (March 2nd,2010) indicated that 25% contact front and 25% contact at the back is almost same as the No or little contact case*Table 1 Summary of the ResultMaximum temperature (K) after 1 min (900 pulses)(copper melting point ~1273 K) * Note: The bold phase temperature are probably most likely case if the proper care being taken to insure a contact around the beam spot.

  6. Temperature Result

  7. Temperature Result

  8. Temperature after 30 days50% contact

  9. Temperature (K) Result after 30 days

  10. Extra case study • Message from Fernanda: “Below I am sticking with my understanding of power, therefore I am calling KW what you call KJ.Anyway, for Operational scenarios, your question1) current:         9 Hz @ 10 usec @ 400MeV @ 35 mA = ~2.0E13 pps equivalent of 1.260 KW.(DONE)2) Near future: 15Hz @  4 usec @ 400MeV @ 35 mA = 1.3 E13 pps equivalent of 0.840 KW.- (DONE)These are the numbers that we should use in the computation for "operational" scenarios.Now, every day there is a 1 min or 3 min of 35 mA @ 15 Hz @ 20 usec @ 400MeV sent to the dump at least 3 times a day in conjunction with the operational scenario. - extra caseI am not sure how you will handle this complexity”. • So, I did some extra simulation to see what happen with above case. By assuming 35 ma@15 Hz@20 usec- gives 4.2 KW (Fernanda, can you double check it ?) and run it for 3 min x 3 times consecutively (worst case).

  11. Extra case study

  12. Extra case study

  13. Structural Calculation(Working in progress, expect to be done for next meeting , in ~2 weeks ? Hopefully) • For structural calculation: • Buckling calculation: to find critical collapeingpressure Pcr for a given structure (E and t) and compare it with CGA (SF=2)or ASME (SF=3) code for the safety factor (SF). • Stress calculation : if the structure passes the buckling SF requirement, then the working stress needs to be checked under the operating load (p=15 psi). • The thermal stress due to temperature rise. • The combine stress due to the thermal and structure load (vacuum). • The deformation if it is required/interested .

  14. StructuralCalculation • Buckling calculation for the cylindrical section: a) 8” copper pipe with the wall thickness: t=(8.625”-8.329’)/2=0.148” And E=16.7 mpsi, Sy (yield)=4830 psi Su(ultimult)=30.6 ksi (? Depending upon the what kind copper it is ). The collapeingpressure Pcr can be found for “ thin tube under uniform lateral external pressure “ Pcr=(1/4 )*E/(1-u^2)*(t/r)^3 =232 psi such that SF=Pcr/Pop=232/15=15.4 15.4>>SF= 2 (CGA) and 15.4>>SF=3 ( ASME) And the hoop stress due 15 psi vacuum load can be found as σ=p*r/t=15*4/0.148=405 psi << 2/3*Sy=3220 psi

  15. Buckling for the 6 sided copper tubesame material; SF=91 for p=15 psi external

  16. Stress due 15 psi for the 6 sided tube

  17. Stress due 15 psi for the 6 sided tube

  18. Stress plot along section AA

  19. Structural calculation • Still working in progress. • Need to look at the thermal stress due to the temperature . • Need to look at the thermal+vacuum load combined case. • And deflection if interested