1 / 2

GISFI #5 Meeting Report: FRN (Future Radio Networks)

GISFI #5 Meeting Report: FRN (Future Radio Networks). Company: VNL Author(s): Krishna Sirohi Contact information: krishna.sirohi@vnl.in , +919899488800 Purpose: Approval. FRN Working Group. Progress Scope and the progress so far was presented by Krishna Sirohi 9VNL), WG Chair.

frisco
Download Presentation

GISFI #5 Meeting Report: FRN (Future Radio Networks)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GISFI #5 Meeting Report: FRN(Future Radio Networks) Company: VNL Author(s): Krishna Sirohi Contact information: krishna.sirohi@vnl.in, +919899488800 Purpose: Approval GISIF#XX, Date

  2. FRN Working Group • Progress • Scope and the progress so far was presented by Krishna Sirohi 9VNL), WG Chair. • Technical and Management Report has been introduced to invite further contributions. • Cellular Networks radiation measurement mechanism proposal from Subir was discussed and further contributions from standardization perspective are invited in subsequent meeting. • Meeting agreed on the FRN WG Chair proposal on GERAN Active Sharing Technical report. Proposal to include 3GPP2 networks for Active sharing requirement has been agreed. Timeline as proposed in the proposal has been agreed by the meeting. VNL, Ericsson, NSN, Huawei, NEC(to be confirmed) have agreed to work onn this work item. • Decisions • Attempts to deploy Ultra-Low Radiation Cellular networks are to be invited to GISFI and support through its standardization program. • Work is expected to progress in continuous manner between the meetings. Working group chairs are requested to release interim progress reports on monthly basis. GISFI#XX, Date

More Related