An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Power Company Issues & High Voltage Design Chris Tooley President Quad Plus

  2. Power Company Issues & High Voltage Design • Presentation Overview • Introduction • Getting Power Company approval • Power Studies • Shredder Drive options • Static VAR compensator • High voltage design on your site Quad Plus

  3. Power Company Issues - Power Quality • Voltage Fluctuation – Flicker • Motor Startup • Changing Load • Power Factor • Harmonics Quad Plus

  4. U.S. Electric Power Industry Average Retail Price of Electricity by State Quad Plus

  5. Power Company Issues Joseph Crosetto – Recycling Industry Manager Quad Plus

  6. Power Grid Basics Quad Plus

  7. Power Company Issues • Power Company Perspective • Power grid getting stretched thin • Power grid built and changed over many years • Car Shredders are an unusual load • New infrastructure must work now and in the future • New customers pay for line upgrades Quad Plus

  8. Power Company Issues • Strict Standards • IEEE 1453 – Flicker • IEEE 519 – Harmonics • Upside • You can do the same analysis as power company • If you meet standards you probably won’t have problems • Downside • Traditional shredder plant may require dedicated circuit Quad Plus

  9. Power Company Issues • Connecting to the existing distribution lines • Generally less expensive • Dedicated service • Generally more expensive • Cost can kill a shredder project Quad Plus

  10. Power Company Issues • Construction Allowance • Estimated power bill • Primary Metering • Yard owns transformer – lower power bills • Secondary Metering • Power company owns transformer – higher power bills Quad Plus

  11. Power Company Issues • Traditional Shredder Plant • Dedicated Service • Other Shredder Drives • Possible connect to existing distribution lines Quad Plus

  12. Power Company Issues • Picking a Shredder Drive • Research the grid • Understand your options • Buy a shredder drive you know will work Quad Plus

  13. Power Company Issues • Submit request for service to power company • Wait months • Yes/No answer • Use a Power Quality Specialist • Gets info about the power grid • Models various solutions • Give you options which will work • Give you complete analysis • Submit the best option for you that you know will work Quad Plus

  14. Power Company Issues • Power Company Evaluations (sometimes) • Overly Conservative • Less thorough • Make future planning easier • Not have resources / modeling software • Could make mistakes Quad Plus

  15. Power Company Issues • Don’t annoy the Power Company • Don’t make frivolous requests for service • Finalize your equipment before requesting service • Fill out service request form as best as possible • Also supply logical electrical requirements • Have the right person on your end of the line • Offer to do the analysis yourself • Propose a system you know will work Quad Plus

  16. Power Studies - Flicker Quad Plus

  17. Power Studies - Harmonics Quad Plus

  18. Power Studies • Initial calculations • Consultation with the customer • Final report • Power company approval Quad Plus

  19. Shredder Drive Options Joe Kowalkowski Technical Manager for the Recycling Industry Quad Plus

  20. Shredder Drive Options • AC Wound Rotor Motor controlled by Liquid Rheostat • DC Shredder Drives • AC Squirrel Cage Motors • AC Wound Rotor Motor controlled by SPR Drive • Static VAR Compensator Quad Plus

  21. Shredder Drive Options • AC Wound Rotor Motor controlled by Liquid Rheostat • 3000 – 9000 HP – 80”, 98” & 120” mills • Issues with flicker Quad Plus

  22. Shredder Drive Options • AC Wound Rotor Motor controlled by Liquid Rheostat • Issues with flicker Quad Plus

  23. Shredder Drive Options • AC Wound Rotor Motor controlled by Liquid Rheostat • Poor power factor Quad Plus

  24. Shredder Drive Options • AC Wound Rotor Motor controlled by Liquid Rheostat • Wasted energy in the liquid rheostat • High demand charges Quad Plus

  25. Shredder Drive Options • DC Shredder Drive • 1000 – 9000 HP – 60”, 80”, 98” & 120” mills • Better with flicker Quad Plus

  26. Shredder Drive Options • DC Shredder Drive • Better Power Factor • Lower Demand Charges Quad Plus

  27. Shredder Drive Options • DC Shredder Drive • Problem with harmonics Quad Plus

  28. Shredder Drive Options • AC Squirrel Cage Motor • 500 – 1500 HP – 60”, occasionally larger mills • Worst Flicker • High Demand Charges Quad Plus

  29. Shredder Drive Options • AC Wound Rotor Motor Controlled with an SPR Drive • 3000 – 9000 HP – 80”, 98” & 120” mills • New to the recycling industry • Controls Flicker • Better Power Factor Quad Plus

  30. Shredder Drive Options Kurt Schroeder – Medium Voltage Specialist Quad Plus

  31. Shredder Drive Options • Static VAR Compensator • Reduces Flicker • Maintains Voltage • Improves Power Factor • Improves productivity Quad Plus

  32. Static VAR Compensator Quad Plus

  33. Static VAR Compensator Quad Plus

  34. Static VAR Compensator • Boosting Shredder Performance – No SVC Quad Plus

  35. Static VAR Compensator • Boosting Shredder Performance – No SVC Quad Plus

  36. Static VAR Compensator • Boosting Shredder Performance – Compare SVC Quad Plus

  37. Static VAR Compensator • Boosting Shredder Performance • Dramatic gains with SVC Quad Plus

  38. Static VAR Compensator • Boosting Shredder Performance • Dramatic gains with SVC Quad Plus

  39. High Voltage Design Tom Engel – Vice President, Engineering Services Quad Plus

  40. High Voltage Design • High Voltage Design Engineers • Hand Shake with the power company • Design the site medium voltage distribution • Size and specify switch gear • Substation design • Sizing Transformer for auxiliary equipment • Fusing and protection coordination • Equipment spacing and set back • Electric code requirements Quad Plus

  41. Early Considerations in Design • Where is your yard located in the overall power grid? • Is you supply of power from the utility Stiff or Soft? • Will you be required to pay to bring more power to your site? • If so, what voltage will it be supplied at and why? • What other utility requirement do you need to satisfy? • Is your mill drive AC, DC? • What voltage is your drive going to operate at? • Do you want a dedicate source for your drive, or can you share the incoming power? What are the advantages and disadvantages of each? • What is the distribution of loads in your yard • What is the planned timing of your start up? • Do you plan/ want to use existing equipment? Will it even work? What are other considerations? Quad Plus

  42. Electrical Design – One Line Quad Plus

  43. Electrical Design – Plot Considerations Quad Plus

  44. Low Voltage/ Medium Voltage Comparison 1st - 1250HP Motor, 13.2kV Source (Efficiency and Power Factor Estimated at 85%) HP1≔1250 ehp E1≔13200 V Eff≔0.85 PF≔0.85 Quad Plus

  45. Thank You! Questions or Comments? Quad Plus

  46. AC Wound Rotor Motor Curves Quad Plus