1 / 36

ARCH 1290 ARCHITECTURAL CADD ARCH 1200 ARCHITECTURAL DRAWING II

ARCH 1290 ARCHITECTURAL CADD ARCH 1200 ARCHITECTURAL DRAWING II. PROFESSOR PAUL KING It ’ s time for Research!. SLIDE 2 – TEAM 5 Profile. What attracts you to the study of Architecture?

Download Presentation

ARCH 1290 ARCHITECTURAL CADD ARCH 1200 ARCHITECTURAL DRAWING II

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ARCH 1290 ARCHITECTURAL CADDARCH 1200 ARCHITECTURAL DRAWING II PROFESSOR PAUL KING It’s time for Research!

  2. SLIDE 2 – TEAM 5 Profile • What attracts you to the study of Architecture? • “I view architecture as a work of art with space of opportunity. It’s a field where I can make someone happy by my thoughts to reality .”Syndi Wilkinson • “I enjoy using photography to capture the different elements of architecture.”Nita Velasquez • “Architecture is a passion where I seek beauty, space and functionality. I enjoy brainstorming my ideas using photography, design, painting and build.”Debora Tannenbaum • “Architecture is a field where I can express my creativity with rules but no guidelines.”Jeffrey Rodriguez

  3.  syndi Wilkinson

  4. New Castle Fieldhouse • The New Castle Fieldhouse is a 9,325-seat multi-purpose arena in New Castle, Indiana, USA. It is home to the New Castle Chrysler High School Trojans basketball team. Built in 1959, it is the largest high school basketball gym in the world. • The New Castle Fieldhouse was built by the Ralph Hunnicutt & Sons Construction Company. The main basketball is a "sunken" floor, meaning that one enters the building at the top of the bleachers and the playing floor is below. The distance from the level where one enters to the peak of the roof is the same as the distance from where one enters to the playing floor. Information

  5. The New Castle Fieldhouse gym is the largest high school basketball gym in the world IT hosts  high school volleyball games, wrestling meets, gymnastics competitions, and gym classes during the school day. The top of the Fieldhouse is bordered by a 1/7 of a mile rubber track. The track is used for gym classes as well as being open to the public in the mornings, evenings and during lunch period. program

  6. Lighting: • With few exceptions, metal halide high bay and low bay lights are the best luminaires to use for gymnasium lighting.  They are common in school gyms, clubs, and recreational basketball courts and provide a robust source of white light with a high CRI Lighting

  7. Long-span & structures • long span steel trusses for roof framing members

  8. Sites • http://www.rlldesign.com/gymnasium-lighting-a-214.html • http://www.enotes.com/topic/New_Castle_Fieldhouse • http://www.usatoday.com/sports/preps/basketball/2004-02-25-ten-great-hoops-newcastle_x.htm Credits

  9. Nita Velasquez

  10. Grace Church School Gymnasium  • Location: 86 4th Ave New York, NY 10003 • School: Grades K-8 and 9 • Gym Location: Underground, adjacent to James Renwick’s landmark gothic revival church • Architect: Alspector Architecture LLC Information

  11. Gym Accommodates; • Basketball • Volleyball • Soccer • Rock climbing • School events/parties • It also hosts events from other schools and colleges program

  12. The Gym has both interior and exterior windows and a stair way to the ground level Aesthetics & Function

  13. Lighting: This Gym uses; • ceiling lights • natural light - via a series of large exterior and interior windows • Ventilation: There are large circular vents and smaller air units located on the south wall Lighting & Ventilation

  14. Has an Intensive green roof Required underpinning of the adjoining church and loft building Long-span & structure

  15. Construction: • Required underpinning of the adjoining church and loft building • Extension under the public sidewalk • Within 20 feet of the Broadway subway tunnel • site-specific vibration monitoring program was prepared due to the site’s close proximity to the City’s subway line Construction assembly • Roof: Intensive green roof • Street trees • Garden • Playground

  16. Extra: Underpinning • Underpinning: The process of strengthening the foundation of an existing building or structure. • Reasons for underpinning: • Foundation is weak or unstable • Construction that requires the excavation of the soil that supports the foundation

  17. Sites • http://www.gcschool.org/about-gcs/history-and-timeline/index.aspx • http://www.alspectorarchitecture.com/gcs.htm • http://www.schooldesigner.com/Architects/Alspector-Architecture-LLC/Elements/Gym-Under-Ground.asp • http://www.structuretone.com/ST/index.nsf/O/GraceChurchSchool?opendocument&Sectors=Education~Education • http://www.foundationsystemsrepair.com/foundation-underpinning.html • http://www.google.com/imgres?q=underpinning&um=1&hl=en&sa=N&biw=1335&bih=784&tbm=isch&tbnid=B_uA0yluh1koHM:&imgrefurl=http://www.foundationrepair.org/underpinning&docid=0ZNsTRWeBDKtcM&w=645&h=443&ei=teiRTuu1Bufl0QGw__Ai&zoom=1 • http://en.wikipedia.org/wiki/Main_Page Credits

  18. Debora Tannenbaum

  19. BMCC-Borough of Manhattan Community College/CUNY • Location: 199 Chambers St. New York, NY 10007 • Two Year College • Gym Location: Ground 2, adjacent to Harrison Street, Tribeca • Administration and Planning: Vice-President Scott Anderson INFORMATION

  20. FIT-FASHION INSTITUTE OF TECHNOLOGY/SUNY • Location: Seventh Avenue at West 27th Street New York, NY 10001 • Two and Four Year College • Gym Location: Underground, B Building level SC Chelsea area INFORMATION

  21. BMCC/CUNY PROGRAM RECREATION FACILITY INCLUDES: • BASKETBALL • WEIGHT ROOM • HANDBALL • BOWLING • BASEBALL • SOCCER’ • VOLLEYBALL SPORTS TEM COMPETE IN BOTH: CUNY ATHLETIC SYSTEM, AND LOCAL NCAA COLLEGIATE SPORTS SYSTEM

  22. FIT/SUNY PROGRAM RECREATION FACILITY INCLUDES: • TRACK AND FIELD • DANCE • SOCCER • TENNIS • VOLLEYBALL INTERCOLLEGIATE TEAMS IN TENNIS, CROSS-COUNTRY, HALF-MARATHON, TRACK AND FIELD, DANCE, WOMEN’S VOLLEYBALL FIT TEAMS COMPETE AGAINST OTHER SCHOOLS IN REGION XV OF THE NATIONAL JUNIOR COLLEGE ATHLETIC ASSOCIATION

  23. PROGRAM • MULTI-USE SPACE: 103’ X 143’ • PERIMETER CURTAINS • HANG DIVIDING NETS ABOUT 12’ ABOVE THE FLOOR • HOME AND VISITORS SEATING AREAS • WALLS WITH CUSHIONS • CARDIO / WARM UP AREA AND EQUIPMENT • STANDARD GALVANIZED STEEL PIPE POST WITH STELL CLAMP FOR HANG BASKETS AND PORTABLE HYDRAULIC GOAL • MOVABLE WALL ASSEMBLY FOR COURT CONVERSION • FLOOR EXERCISE MAT AREA • FLOORING OVER WOOD

  24. AESTHETICS & FUNCTION

  25. VENTILATION • CEILING LIGHTS • NATURAL LIGHT – EXTERNAL WINDOWS

  26. LONG-SPAN STRUCTURE TYPE OF ROOF AND SUPPORT

  27. CONSTRUCTION ASSEMBLY FLOOR STRUCTURE ASSEMBLY: • 1 OR 2 WAY CONCRETE SLAB OR FOR HEAVIER 2-WAY CONCRETE SLAB ROOF STRUCRURE ASSEMBLY: • CONCRETE FLAT SLAB • STEEL TRUS • 1 OR 2 WAY CONCRETE SLAB EXTERIOR WALL ASSEMBLY: • CMU AND BRICK VENEER (INSULATED) • CMU INSULATED GYMNASIUMS DISTRIBUTED LIVE LOADS: • 100 PSF • LONG SPAN SYSTEM STEEL TRUSS FLAT SURFACE • SEISMIC – RESISTANT DESIGN MASONRY

  28. REFERENCE • www.cuny.edu • www.bmcc.cuny.edu • www.suny.edu • www.fitnyc.edu • Allen and Iano. 2009. “Fundamentals of Building Construction- Materials and Methods". John Wiley &Sons. Hoboken, NJ

  29. Jeffrey Rodriguez

  30. Site Info. & Credits • Carlsbad High School Gymnasium • Location: • Carlsbad, California Architect Team: • Principal-In-Charge: Ralph Roesling • Manager: Chuck forte • Project Architect: Rommel Olaes Engineer: • Civil: Flores Lund Consultants • Structural: Stedman & Dyson Structural Engineers • Mechanical: E/C Engineering • Electrical: Semenza Engineering

  31. Program • Capacity: • Designed to fit up to 2,ooo people • Space size: • 28,300 square feet • Space: • Full size basketball court • Two cross courts • Training room • Locker rooms • Offices • Storage areas

  32. Aesthetics & Function • Two types of CMU. • Steel beams & Columns • Windows at entrance of the building • Two stairways

  33. Lighting & Ventilation Ventilation Lighting Natural Lighting

  34. Roof Structure: • Deep cellular steel deck • Standing seam metal (Absorbs less heat) Long-Span & Structure • Long-Span: • Steel trusses • Curved Steel beams A. B.

  35. Wall: • Load-bearing concrete masonry Construction Assembly

  36. Sources • http://www.rntarchitects.com/design/ProjectPdfs/k12/CarlsbadHighSchoolGymnasium.pdf

More Related