1 / 5

Proposal of SSD Products Development/Manufacturing

Proposal of SSD Products Development/Manufacturing. Wrote by Wilson Chen Date : 2013/09/16. Outline. Introduce work experience of myself SSD Architecture / SSD vs. eMMC Architecture SSD Product Development and Team build SSD Product Development Timeline SSD Manufacturing

Download Presentation

Proposal of SSD Products Development/Manufacturing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Proposal of SSD ProductsDevelopment/Manufacturing Wrote by Wilson Chen Date : 2013/09/16

  2. Outline • Introduce work experience of myself • SSD Architecture / SSD vs. eMMC Architecture • SSD Product Development and Team build • SSD Product Development Timeline • SSD Manufacturing • Controller & NAND Flash Alternate • NAND Flash Category and Sorting • Summary

  3. Introduce work Experience of myself • Entry (1982 ~ 1991) • Apple II (CPU:6502) & IBM (CPU:8086 /88/286/386/486) are compatible • Foreign country experience in USA, Canada and South Africa • Senior (1992 ~ 2013) • Foreign company experience in Taiwan (Philips, Samsung , IBM and OCZ) • Work experience in China (Foxconn, Memoright and ADATA) • Experience in Marketing also PC/NB/Storage and Server development • Professional • R&D/NPI/Engineering/Manufacturing/FAE/Sales Experience • PC/NB/Server/HDD/ODD/SSD of Product/Production Engineering • Managed more than 100 engineers in Foxconn for production engineering • EMBA in NCU (2002 ~ 2005) • Master degree of Information Management

  4. SSD Architecture Controller Flash Flash SATAII/III Host Flash CRC Flash Flash Flash Flash Flash Buffer Mgt Encryption DuraWrite

  5. Team Build Process • 1. Define the business & development strategy • 2. Build the organization • 3. Arrange the manpower • 4. Implement the IT System

More Related