1 / 5

Beam Requirements for PVDIS

Beam Requirements for PVDIS. X or Y. X’ or Y’. Explain another time. HAPPEX-3 Fall 2009. ~ Energy . ~ 150 nm. Diffs = helicity-correlated diffs in microns. 0.005 um = 5 nm. 1 slug = 1 period of half-wave plate state ~ 24 hours.

fynn
Download Presentation

Beam Requirements for PVDIS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Beam Requirementsfor PVDIS X or Y X’ or Y’ Explain another time

  2. HAPPEX-3 Fall 2009 ~ Energy ~ 150 nm Diffs = helicity-correlated diffs in microns.0.005 um = 5 nm 1 slug = 1 period of half-wave plate state ~ 24 hours “Sign corrected”= put in a sign flip correlated to half-wave plate, to show the effect of HCBA on combined sample.

  3. “Parity Quality Beam”good enough for PVDIS Big asymmetries, small derivatives wrt beam parameters Marginal for PREX ( especially BPM12x ~ Energy ) • Interception at Injector ? • Some reductions in diffs after work done at injector • e.g. after Sept 15 and Oct 15 work • Largest Component of diffs flips sign with half-wave plate • Could be a Pockel Cell “steering effect” • Could be electronics pickup from Pockel Cell  Seems ruled out by PC-off runs.  Speculative hypothesis on next slide.

  4. Speculative Cause of BPM12x (Energy) diffs • Electronics pickup from Pockel Cell? • Very small, but “amplified” somehow when slits closed • Improved injector tune in last week seemed to fix it. (K. Kumar)  Can affect the beam, as during Happex-He.  Turns into an Energy diff. • Strategy • Watch the slug plots during PVDIS • If not good enough, may revisit pickup issue & injector transmission issue if PVDIS allows or requires.

  5. PVDIS Run Plan • Down time Oct 28 ~ Nov 4 ? • Swap detectors, cabling work, target work • Commissioning Nov 4 ~ 7 • Establish good detectors, target boiling tests, Compton tests, Parity quality beam, BCM calibration, PVDIS DAQ. • Production to Dec 23 Take data on LD2 Periodic Auxiliary Measurements Compton Issues Moller, Q2 , Backgrounds Transverse Polarization Test Run (2 shifts, Invasive !) Explain next week Backgrounds

More Related