Market Based Solutions for Demand Response Providers

Market Based Solutions for Demand Response Providers. Today and the Future Alice Jackson Occidental Energy Ventures Corp. Demand Response Today. Active Opportunities Responsive Reserve Service - Available Non Spin – Available but flawed RPRS – Not Available

fynn
Download Presentation

Market Based Solutions for Demand Response Providers

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Market Based Solutions for Demand Response Providers Today and the Future Alice Jackson Occidental Energy Ventures Corp.

  2. Demand Response Today • Active Opportunities • Responsive Reserve Service - Available • Non Spin – Available but flawed • RPRS – Not Available • Controllable Load – Pilot program • Passive Opportunities • Balancing Energy Price Responsiveness • Peak Shaving

  3. Demand Participation over Time (as of 09/2006 DSWG Mtg)

  4. Today’s Market • Active Participation Sample • RRS from LaaR (max 1150 MW/hr) • 2/3 Bilateral Market • 1/3 ERCOT Daily Auction • Passive Participation Sample • Peak Shaving • ERCOT acknowledges that it occurs and can roughly estimate activities

  5. Peak Shaving Sample

  6. Excess LaaR Possibilities • Replacement Reserve Service (RPRS) from LaaR • Work with ERCOT to resolve the systems issues with permitting LaaR to perform in RPRS • Controllable Load Resources • Complete the pilot program and have Controllable Load Resources as a fixed part of the Zonal market • Non-Spin through Linked Bids • Currently LaaR Resources can not link RRS bids with NRS bids; the ERCOT systems effectively kick out the RRS bid

  7. Controllable Load Resources • What is a Controllable Load resource? Zonal Protocol Section 6.5.1.1 states: “…load resources capable of controllable reducing or increasing consumption under dispatch control (similar to AGC) and that immediately respond proportionally to frequency changes (similar to generator governor action)”

  8. ERCOT Controllable Load QSE Process Flow: • ERCOT sends dispatch signal to QSE • QSE passes signal to Controllable Load Resource (CLR) • CLR control system monitors real-time frequency • CLR control system accepts ERCOT signal and calculates required response (ERCOT dispatch +/- frequency response) • CLR responds • QSE views response via telemetry and passes signal to ERCOT RRS / RGS Dispatch Signal Telemetry Telemetry Real-time Frequency Signal Controllable Load Control System CLR dispatch set point Telemetry

  9. CLR Example: Pipeline Pumps w/Variable Speed Drives • Could provide Regulation Up and Regulation Down Service • Large downstream tank with 2 days swing of volume and motor provides 1 MW up and 1 MW down swing capability -OR- • Could provide Responsive Reserve • Set point is at full motor output unless called to provide the service

  10. Outstanding Nodal Issues • Load Resources not allowed in RUC (Reliability Unit Commitment) • Market Power / Cost Issues • Load Resources are not paid LBMP upon activation • This causes a faulty price signal

  11. Market Based Load Response • Important to maintain the integrity and quality of demand response by implementing market based solutions. • By definition market based solutions by demand response providers lower costs to consumers • Lowering the cost to consumers is not necessarily true of subsidized programs.

  12. Conclusion • Demand response is off to a good start in ERCOT. • In practice, further participation is being limited by assumptions about the capability of Load Resources versus the facts about Load Resource capabilities. • As a demand response community we must work together to keep moving forward to advance the solutions currently in place and develop new market based solutions to meet the needs of the future.