An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Don Pedro Project Relicensing Modesto Irrigation District | Turlock Irrigation District FERC Project No. 2299

  2. Water Temperature Modeling • Procedural Background • July 16, 2009 FERC Order –IFIM and Water Temperature Modeling Study Plan • October 14, 2009 – Districts Final Study Plan to FERC • Includes Agency Comments on Draft Plan and resolution • May 2, 2010 FERC Order – Study Plan Implementation • Staff conclusions regarding Agency Comments • July 21, 2010 FERC Order – Revised Implementation Schedule • November 9, 2010 Progress Report • March 12, 2011 Final Report Deadline 2 Don Pedro Project Relicensing, FERC Project No. 2299 April 20, 2011

  3. Water Temperature Modeling 3 Don Pedro Project Relicensing, FERC Project No. 2299 April 20, 2011

  4. Water Temperature Modeling • Study Questions from July 16, 2009 FERC Order: • Flows needed to meet MWAT of 68°F (20°C) from La Grange Dam (RM 53) to Roberts Ferry Bridge (RM 39.5) in summer • Relationship between flow and water temperature at various time periods in the lower Tuolumne River • Agency Study Questions – Flows needed to meet: • MWAT of 64.4°F (18°C) from La Grange Dam (RM 52) to Roberts Ferry Bridge (RM 39.5) in summer • MWAT of 18ºC (64.4ºF) from La Grange Dam (RM 52) to the San Joaquin River (RM 0) from October 15 to December 1st • MWAT of 13ºC (55.4ºF) from La Grange Dam (RM 52) to Roberts Ferry Bridge (RM 39.5) from October 15, to February 15 • MWAT of 15ºC (59.0ºF) from La Grange Dam (RM 52) to San Joaquin River (RM 0) from March 20 to May 15 4 Don Pedro Project Relicensing, FERC Project No. 2299 April 20, 2011