70 likes | 248 Views
Water Allocation Committee River Basin Hydrologic Model Development Schedule. Division of Water Resources July 13, 2011. IMPROVE RIVER BASIN MODELING – SL 2010-143. Models for all river basins Model components Report annually to the ERC Approval by the EMC.
E N D
Water Allocation CommitteeRiver Basin Hydrologic Model Development Schedule Division of Water Resources July 13, 2011
IMPROVE RIVER BASIN MODELING – SL 2010-143 • Models for all river basins • Model components • Report annually to the ERC • Approval by the EMC
Status of River Basin Hydrologic Model Development in North Carolina
River Basin Water Resources Plans and Hydrologic Models Water Resources Plans (No EMC Approval) River Basin Hydrologic Models (EMC Approval)
For additional information on river basin models • Steve Reed at (919) 715-5424 or steven.reed@ncdenr.gov • Neelufa Sarwar at (919) 715-0386 or neelufa.sarwar@ncdenr.gov . Or the DWR website at http://www.ncwater.org/Data_and_Modeling/