1 / 16

Baker Hughes & WITSML

Baker Hughes & WITSML. John Shields Baker Hughes Houston. INTEQ. Baker Atlas. Baker Oil Tools. Baker Hughes BEACON Services. Norwegian Government White Paper. 15 Rig Capacity for new BEACON Centre,. BEACON 2 Planning. BP and Norsk Hydro on Board. 1998. 2001. 2002.

gafna
Download Presentation

Baker Hughes & WITSML

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Baker Hughes & WITSML John Shields Baker Hughes Houston

  2. INTEQ Baker Atlas Baker Oil Tools Baker Hughes BEACON Services

  3. Norwegian Government White Paper 15 Rig Capacity for new BEACON Centre, BEACON 2 Planning BP and Norsk Hydro on Board 1998 2001 2002 Pilot Centre: 24 hrs Remote Operation MWD & DA Initiated Project Team 6 wells for BP and Norsk Hydro BPs OOC BEACON History BEACON Phase1 Commercial BEACON Phase 2 Commercial 2005 1997 2000 2003 2004 2006… BEACON Phase 2 pilot BEACON 2006: 10 opr 2007: 13 opr 9 years and > 70 wells - 350,000m drilled

  4. BEACON Norway program for 2006 • Integrated Service Delivery • DD, MWD/LWD, ML, Fluids, Completion • Detailed planning • 10 operations • 2 in UK

  5. Norsk Hydro WITSML Wells in 2006 Other WITSML Customers include Statoil, BP, Shell and Marathon

  6. BEACON Phase 1 BEACON Phase 2 BEACON Phase 2 Oseberg East IO Development G1 and G2 Source: OLF

  7. BEACON Phase 1 BEACON Phase 1 • Personnel reductions offshore • Successfully fulfilled > 50 wells and > 250,000 m • Network reliability proven to be sufficient • Changes to work processes and efficiency • Some competence improvements Offshore

  8. BEACON Phase 2 24-7 RealTime focus • Major changes • New work processes • Improve Specialisation • Increased emphasis on cross training • Results – New Work Disciplines • Offshore: Advantage Real Time Engineer (ARTE) • Combined MWD/ML position • Focus on data acquisition • Rig based • Onshore: BEACON Engineers • High focus on services and information quality • Support multiple rigs and customers • Shore based • Improvements • 24-7 operational environment onshore • Optimizing work processes and efficiency • Improved competence and capacity • Reduced personnel on board (POB) • Enhanced service quality Dedicated support 24-7 Services and information quality

  9. BEACON phase 2 – Oseberg East • Full integration • Drilling Fluids / Cmt • Completion (Csg exit, Liner, TCP, IWS) • Drilling contractor • Tot crew drilling = 36 • TOT BH crew ~ 6 - 7 

  10. BEACON onshore services • Focus on 3 main elements • Geoscience Applications Engineering • Drilling Optimisation Applications Engineering • Tech Support for D&E, Logging, Fluids and Completion 1. 2. 3. Geoscience Drilling Optimisation Tech Support • Applying 24-7 Real-time solutions to maximize value • 3rd party applications can share data via WITSML

  11. 3-D visualization of Completion

  12. Close-up of completion elements

  13. BEACON Results • HSE • 40,000 fewer offshore hrs • 600 fewer helicopter trips • Enhanced crew availability • Human Factors • New career opportunities with more responsibility • Improved utilisation of senior personnel • Greater technical competency and wider professional knowledge • Improved team work internally and towards Customer • Technical and Operational • Repeatable high quality of information deliveries • Catalyst for further technical development, e.g. WITSML • More focus on improved QA/QC real-time data

  14. BEACON Expansion • North America - Houston • Supports worldwide operations • Saudi Arabia • Rapid expansion • Need to keep data within country • Aberdeen • Support for West Africa operations • Other Areas

  15. Summary • Continuous evolution of BEACON during 9 years built on proactive dialogue with Customers • BEACON has completed first generation • BEACON Phase 2 is close to industry definition of Generation 2 Integrated Operations • With Oseberg East we will deliver Generation 2 • WITSML is a key technology to enable Integrated Operations

More Related