An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Innovative Contracting Construction Management Association of America Seminar May 17, 2013 California Department of Transportation

  2. Traditional Project Delivery • Design-Bid-Build (DBB) • Specified by Public Contract Code • Design must be complete • Awarded to the lowest responsible bidder

  3. Why Use Innovative Methods? • Faster Delivery • Cost Certainty • Constructability • Better Partnering • Risk Transfer • Innovation

  4. Innovative Contracting Effort Hired Trauner Consulting Services, Inc. to: • Identify methods used by others • Identify the pros and cons of each method • Assist in developing policy, procedures, and processes for selected methods • Assist in developing training

  5. Innovative Contracting Report Identified 27 methods divided into the following categories: • Project Delivery Systems • Procurement Practices • Contract Management Methods

  6. Caltrans Experience Design-Bid-Build Design-Sequencing Additional Methods Indef. Delivery/ Indef.Quantity Agency-CM CM at-Risk Design-Build Early Contractor Involvement Project Alliancing Contract Maintenance Project Delivery Systems

  7. Caltrans Experience Cost-Plus-Time (A+B) Bidding Low Bid Lump Sum Bidding Additional Methods Multi-Parameter (A+B+C) Bidding Alternate Design Alternate Bid Additive Alternates Best-Value Reverse Auction Bid Averaging Procurement Practices

  8. Caltrans Experience Incentive/Disincentive Lane Rental Flexible Notice to Proceed Warranties Additional Methods Liquidated Savings Active Management Payment Mechanism No Excuse Incentives Shared-Risk Contingency Fund Contract Management Methods

  9. Design-Build

  10. Design-Build A delivery method where a contract for both the design and construction of a project is awarded to a single entity.

  11. Design-Build

  12. Legislation – Senate Bill 4 • Allows 15 design-build projects • 10 Caltrans • 5 Local • California Transportation Commission must authorize • Prequalification versus shortlisting • Allows “Low Bid” or “Best Value” awards • Sunsets January 1, 2014

  13. Authorized Projects Awarded Projects • LA 10/110 – Express Lanes $ 72 million • Mad 99 – Rehabilitate Roadway $ 23 million • SM 101 – Install Ramp Metering System $ 11 million • Fre 180 – Construct Braided Ramps $ 41 million • LA 10/605 – Construct EB 10/SB 605 Connector $ 46 million • SD 805 – I-805 North HOV/BRT $ 72 million • LA 710 – Gerald Desmond Bridge $650 million • SBd 15/215 – Devore Interchange $208 million • Riv 91 – HOV Lanes $633 million Projects Currently in Procurement • Cajon Pass $140 million • North Region Bridge Deck Rehabilitation $ 58 million

  14. Why Use Design-Build? • Faster Delivery • Cost Certainty • Constructability • Risk Transfer • Innovation

  15. Alternative Technical Concepts Alternative Technical Concepts (ATC) are proposed changes to the Department’s supplied basic configurations, design criteria, or construction criteria which provide a solution that is equal to or better to the requirements in the Request for Proposals.

  16. Alternative Technical Concepts (ATCs) ATCs submitted – 206 Value of ATCs submitted – $967 million ATCs approved – 109 Value of ATCs approved – $502 million ATCs incorporated – 29 Value of ATCs incorporated – $142 million

  17. Devore Interchange Project • Deliver project 18 months earlier • Secured $108 M SHOPP funding for the project • Improved design, I-15 NB continuity • Reduced right of way take (10 parcels) • Reduced environmental impacts • $40 M savings

  18. Construction Manager-General Contractor

  19. Construction Manager / General Contractor (CM/GC) A delivery method that allows an owner to engage a construction manager to provide input during the design process. At an agreed upon point, the owner and construction manager negotiate a price for construction of the project and the construction manager becomes the general contractor.

  20. CM/GC Process

  21. Preconstruction Services • Constructability Reviews • Verify Quantities • Estimate Alternatives • Value Analysis • Risk Analysis • Construction Phasing • Project Scheduling

  22. Authority • Assembly Bill 2498 (Gordon) • Signed September 2012 • Added Section 6700 to Public Contract Code • Authorizes up to 6 projects by Caltrans • Must be administered by Caltrans • 5 projects greater than $10 million • Effective January 1, 2013 • No sunset date

  23. Why Use CM/GC? • Faster Delivery • Cost Certainty • Constructability • Risk Mitigation • Innovation

  24. Next Steps • Develop processes and contract templates • Industry outreach • Project selection • Begin procurements

  25. Useful Links Innovative Procurement Practices Report: http://www.dot.ca.gov/hq/oppd/contracting/InnovativeProcurementPractices.pdf Alternative Procurement Guide: http://www.dot.ca.gov/hq/oppd/contracting/AlternativeProcurementGuide.pdf

  26. Useful Links Design-Build Demonstration website: http://www.dot.ca.gov/hq/oppd/designbuild/db.htm FHWA’s Design-Build Effectiveness Study http://www.fhwa.dot.gov/reports/designbuild/designbuild.pdf

  27. Useful Links CMGC Pilot Program website: http://www.dot.ca.gov/hq/oppd/cmgc/ NCHRP Synthesis 402: Construction Manager-at-Risk Project Delivery for Highway Programs http://onlinepubs.trb.org/onlinepubs/nchrp/nchrp_syn_402.pdf

  28. For More Information Contact: Raymond S. Tritt Chief, Office of Special Projects California Department of Transportation (916) 653-3348 rtritt@dot.ca.gov DBProgram@dot.ca.gov CMGC@dot.ca.gov