1 / 9

W. Wuensch CLIC ACE 26-5-2009

Comparison of structure schedules between presented at ACE of 2-20-2008 and now, a Δ t of 7 months. W. Wuensch CLIC ACE 26-5-2009. X-band structure master schedule (1/2). ACE 10-2008. G. Riddone. X-band structure master schedule (2/2). ACE 10-2008. G. Riddone.

gafna
Download Presentation

W. Wuensch CLIC ACE 26-5-2009

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Comparison of structure schedules between presented at ACE of 2-20-2008 and now, aΔt of 7 months. W. Wuensch CLIC ACE 26-5-2009

  2. X-band structure master schedule (1/2) ACE 10-2008 G. Riddone

  3. X-band structure master schedule (2/2) ACE 10-2008 G. Riddone

  4. 30 GHz structure master schedule ACE 10-2008 G. Riddone

  5. Structures under test ACE 5-2009

  6. Structures under test ACE 5-2009

  7. ACE 5-2009 C10 structures

  8. X-band structure master schedule (1/2) combined Currently active or scheduled testing time To SLAC Fabrication underway Done Done G. Riddone

  9. X-band structure master schedule (2/2) combined Done On hold Done Detailed design not yet launched Done Waiting for collaboration agreement Test not scheduled G. Riddone

More Related