1 / 6

Army Aviation Future Pilot Training System Requirements

Army Aviation Future Pilot Training System Requirements. LTCOL Karl Hamlyn 16 Aviation Brigade. The New Operational Environment. ARH / MRH / CH-47F (Combat Aviation, no longer just support) Complex Battlespace Networked Systems (C2, Mission Management, ISR) Amphibious Operations.

gaius
Download Presentation

Army Aviation Future Pilot Training System Requirements

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Army AviationFuture Pilot Training SystemRequirements LTCOL Karl Hamlyn 16 Aviation Brigade

  2. The New Operational Environment • ARH / MRH / CH-47F (Combat Aviation, no longer just support) • Complex Battlespace • Networked Systems (C2, Mission Management, ISR) • Amphibious Operations

  3. The Current Training Situation BFTS Tamworth CT- 4 (GAP) HQC Oakey Kiowa (GAP) • Issues • Time in training • Limited capability of training platforms • Good at teaching pure flying skills, but… OTT/ROBC Oakey S-70 (ARH)

  4. Training Drivers • Technical Complexity • Easier to fly • Harder to operate / manage • High Cognitive Loading • Complex dynamic environment • Situational awareness • Crew Functioning • Multi-crew environment • Semi / Autonomous functions

  5. Chief of Army’s Intent • Must develop the appropriate skills: • Cognitive skills • Situational awareness • Potential to act as captain of a crew • Download training where possible: • Early exposure to advanced systems • Smooth demand load • Must be Cost Effective: • Training on cheaper platforms • Efficient use of time

  6. CHALLENGES FOR ARMY • Integration of training across two Projects (Air 5428, HATS) • Army not the lead service for either Project

More Related