An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PRESENTATIONONNEW & EFFICIENT solar power SYSTEMS SAMUJJAL GANGULY www.vikramsolar.com

  2. Executive Summary • Challenges • Lack of Customer Awareness • Land Acquisition problems • Initial Cost of Setting up Power Plant is still high

  3. Trends of solar pv technology Overview • Solar energy is generated via 2 kinds of technology: • Solar Photovoltaic (PV) technology • Solar thermal technology • PV are arrays of cells containing solar photovoltaic material that converts solar radiation into electricity • In India, nearly 98% of solar modules manufactured use crystalline silicon technology and merely 2% of modules are manufactured using Thin Film technology

  4. Solar pv market value chain Value Chain – SPV Market • • Solar panel production is done using two technologies – • Crystalline silicon cells – Most dominant technology with more than 87% market share • Thin-film cells – Fastest growing technology due to silicon shortage

  5. Solar PV off-grid applications have a pool of opportunity inIndia

  6. Financial institutions are providing EMI structured loans tofacilitate development in this sector

  7. Coal-based energy companies are slowly entering the SPVmarket in India

  8. Government initiative programs in india A 3- phase approach has been formulated

  9. Scope of roof top solar power plant in west Bengal • In West Bengal the solar energy will solve power woes of the state, which desperately needs development. According to survey the state gets 90% power from coal and crisis is increasing daily. • There are about 2,000 villages in west Bengal where conventional electric line cannot be extended due to prohibitive cost. 400 villages out of these 2000 villages have already been electrified by Solar PV route. • The multi-storey buildings in the state of West Bengal can be encouraged to install solar panels on the rooftops for power generation,

  10. Benefits of roof top solar pv systems - Govt. of West Bengal is in the process of making mandatory for all the public buildings to have solar devices to meet electricity requirements and other applications. All existing and upcoming commercial and business establishments having more than 1.5 MW  of contract demand  will be required to install solar rooftop systems to meet at least 2% of their total electrical load. Further, all the existing and upcoming schools and colleges, hospitals, large housing societies and Government establishments having a total contract demand  of  more than 500 KW will be required to install solar rooftop systems to meet at least 1.5% of their total electrical load -

  11. Benefits of roof top solar pv systems • - Solar rooftop and small solar PV installations can provide a significant amount of energy for in-house loads, reducing peak system demands in urban establishments. Depending on the rooftop area available and building loads, these solar systems can be as large as 0.5 MW and can power a majority of the building’s loads. • Urban local bodies like Municipal Corporations, Utilities, City, Corporations, commercial building like offices and malls may form an essential part of the installation as they posses buildings with considerable roof space..

  12. Technological analysis

  13. Working Principle FOR OFF GRID SYSTEM Battery Bank MJB ACDB LOAD Solar PV Array Stand Alone PCU

  14. some of the roof top project commissioned by Vikram solar 7KW Stand Alone Solar Power Plant at Uttarkhand 5KW Stand Alone Solar Power Plant at Haryana

  15. Technological analysis

  16. Working Principle FOR GRID CONNECTED SYSTEM Grid/Mains Net Meter MJB ACDB Solar PV Array Grid Connected PCU LOAD

  17. One of the roof top project commissioned by vikram solar 30KW Grid Connected Solar Power Plant on a Govt. Building at Kolkata.

  18. Technological analysis

  19. Working Principle FOR OFF GRID SYSTEM Working Principle of hybrid solar pv system Battery Bank Grid/Mains Net Meter MJB MJB ACDB ACDB LOAD Solar PV Array Solar PV Array Stand Alone PCU Grid Connected PCU LOAD

  20. some of the roof top project commissioned by vikram solar 100KW Hybrid Solar Power Plant at Kolkata 10KW Hybrid Solar Power Plant at Kolkata

  21. Technological analysis

  22. And today VIKRAM SOLAR is recognized as one of the Leading Solar PV Module Manufacturing Company & Total EPC Solution provider in Eastern India and known for its Quality, Innovation, Commitment & Experience.

  23. THANK YOU