1 / 14

Subaru Advisory Committee Report

Subaru Advisory Committee Report. すばる小委員長 吉田道利 SAC Chair: Michitoshi Yoshida. SAC members ( 2012/7 – 2014/6). Chair Michitoshi YOSHIDA Co-Chair Wako AOKI Internal members Tomonori USUDA, Naruhisa TAKATO, Fumitaka NAKAMURA, Nagayoshi Ohashi External members

galvin
Download Presentation

Subaru Advisory Committee Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Subaru Advisory CommitteeReport すばる小委員長 吉田道利 SAC Chair: Michitoshi Yoshida Subaru UM 2013

  2. SAC members (2012/7 – 2014/6) • ChairMichitoshi YOSHIDA • Co-ChairWako AOKI • Internal members Tomonori USUDA, Naruhisa TAKATO, Fumitaka NAKAMURA, NagayoshiOhashi • External members Masayuki AKIYAMA, Fumihide IWAMURO, Masahiro TAKADA, Misato FUKAGAWA, Kentaro MOTOHARA, Koichi KATAZA, Kazuhiro SHIMASAKU, Motohide TAMURA • Observers (TAC chair) Nobunari KASHIKAWA (2012/7-2013/6) Takuya YAMASHITA (2013/7 - ) • Ex-officio (Subaru director) Nobuo ARIMOTO Subaru UM 2013

  3. Subaru UM 2013

  4. Subaru UM 2013

  5. Subaru UM 2013

  6. Subaru UM 2013

  7. Subaru Strategic Program • FMOS SSP: FastSound project interim review  OK to continuation of the project • HSCSSP refereeing • Proposal: “Wide-field imaging with Hyper Suprime-Cam: Cosmology and Galaxy Evolution” PI: Satoshi Miyazaki • Science review (3/28 by TAC) OK • Organization review (4/23 by SAC)OK • Final review (4/23 by SAC)  Acctepted. 300 nights @ 5 years (including weather factor) • Start from S14A • Request from SEEDS project (HiCIAO SSP) • Additional 30 nights ← telescope troubles, weather condition, and new science themes • Accepted only 2 nights lost by telescope troubles. Subaru UM 2013

  8. Constraint on time allocation of SSP • Total nights : up to 300 nights per 1 SSP • Duration: up to 5 years per 1 SSP • SSP nights per year: up to 60 nights in total • Up to 25% of the machine time per semester Subaru UM 2013

  9. Discussed items on open use, operation, etc. (except for SSP) • HSC open use timeline • HSC filter acceptance policy • Defined the procedure of acceptance of narrow-band filters • Status of Progress of PFS project • Instrument decommission • Possibility of decommission of FMOS in 2015 for smooth installation of PFS • Time-exchange with Gemini • Queue-mode observation • Open use observer acceptance policy Subaru UM 2013

  10. Expected nights to be allocated to SSP HSC (expected) SEEDS PFS (expected) FastSound Subaru UM 2013

  11. Total nights of all SSPs Open use nights SSP nights Euclid? Subaru UM 2013

  12. Fraction of SSP nights in open-use nights (except for UH nights) PFS start Subaru UM 2013

  13. International relations • Euclid-HSC collaboration proposed by Euclid team • Should consider this item with relationship with other big projects: WFIRST, LSST  “Collaboration of Subaru and big galaxy survey projects in 2020s” workshop (Jan. 11 2014) • GLAO Science Workshop • In Hokkaido, June 12-14 2013 • Cooperation with east Asian countries • East Asian Observatory concept and Pan Pacific Observatoryconcept • Subaru data analysis school in Korea Subaru UM 2013

  14. Discussion items in this year • How to collaborate with the next generation big projects including Euclid, WFIRST and LSST using Subaru • Extension of time-exchange program • International cooperation on Subaru operation (EAO, MKO, and PPO) Subaru UM 2013

More Related