JAXA Increment 19/20 Overview

gannon
Download Presentation

JAXA Increment 19/20 Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Notice : This technical data is furnished on the condition that it will be used by and disclosed to the receiving Cooperating agency and its contractors and sub contractors only for the purposes of fulfilling the cooperating agency’s responsibilities under the Space Station Intergovernmental Agreement (IGA) and Memorandum of Understanding (MOU). It shall not be used for any other purpose, nor disclosed or retransferred to any other entity or government without prior written permission of the Japan Aerospace Exploration Agency (JAXA). 17A Crew/PL Ops Meeting March 26, 2009 “JJ” Keiichiro Sakagami / JEM PAYLOADS(sakagami.keiichiro@jaxa.jp) JAXA Increment 19/20 Overview

  2. CONTENTS • JAXA PL RACKS OVERVIEW • INCREMENT OVERVIEW • KEY MILESTONE • JAXA PL OPS STRUCTURE, ROLES & RESPONSIBILITIES • BACKUP CHARTS

  3. JAXA PAYLOAD RACKS (Saibo, Ryutai) ER 5 JPM1F1 ER 4 JPM1F5 MELFI JPM1D4 Ryutai RackJPM1A3 Saibo Rack (for Life Science) Ryutai Rack (for Material Science) Saibo Rack JPM1A2 Protein Crystallization Research Facility (PCRF) Solution Crystallization Observation Facility (SCOF) Image Processing Unit (IPU) Cell Biology Experiment Facility (CBEF) Fluid Physics Experiment Facility (FPEF) Clean Bench (CB) Port Aft Forward Starboard

  4. Saibo Rack • Utility DC to DC Converter Unit (UDC) UDC receives 120Vdc safing power from a Power Distribution Unit and provides 28V DC Power to experiment equipments such as Micro-gravity Measurement Apparatus. • PEF Access Port for CBEF PEF Nozzle is penetrated into the PEF Access Port when the CBEF has fire. • PEF Access Port for CB • Cell Biology Experiment Facility (CBEF) PEF Nozzle is penetrated into the PEF Access Port when the CB has fire. CBEF provides a controlled environment for studying fundamental phenomena of life in the space environment, using cells, tissues, small animals, plants, or microorganisms. • Payload Power Distribution Box (PPDB) • AAA/SD P-PDB receives main power from a Power Distribution Unit and distributes power to JAXA ISPR Components and Experiment Facilities. • PEF Access Port PEF Nozzle is penetrated into the PEF Access Port when the rack has fire. • Utility Interface Panel • Maintenance Switch Panel (MSP) Utility Interface Panel provides following communication interfaces: 1553B, Ethernet, FDDI, and video. The MSP is used for redundant safety interlock. It is used to protect the crew during maintenance or installation activities. • Clean Bench (CB) CB provides a closed work space for aseptic operation in order to perform life science and biotechnology experiments.

  5. Ryutai Rack • Fluid Physics Experiment Facility (FPEF)) FPEF enables users to investigate the effects of the marangoni convection of the moderate temperature. • Image Processing Unit (IPU) • Protein Crystallization Research Facility (PCRF) IPU receives video data from cameras monitoring various experiments and from the Video Control Unit . IPU records, plays back, compresses, and outputs the data to the high rate data link for transmission to the ground. • Solution Crystallization Observation Facility (SCOF) SCOF and PCRF provides opportunities for fundamental studies of crystal growth of various solutions and proteins. • Payload Power Distribution Box (PPDB) • AAA/SD P-PDB receives main power from a Power Distribution Unit and distributes power to JAXA ISPR Components and Experiment Facilities. • PEF Access Port PEF Nozzle is penetrated into the PEF Access Port when the rack has fire. • Utility Interface Panel • Maintenance Switch Panel Utility Interface Panel provides following communication interfaces: 1553B, Ethernet, FDDI, and video. The MSP is used for redundant safety interlock during maintenance or installation activities. • Utility DC to DC Converter Unit (UDC) UDC receives 120Vdc safing power from a Power Distribution Unit and provides 28V DC Power to experiment equipments such as Micro-gravity Measurement Apparatus. • Storage *Now FPEF silicon oil filter is installed on this position.

  6. INCREMENT 17 OVERVIEW • Inc 17 was the first increment to conduct experiments in Kibo. • Initial checkout for Saibo/Ryutai rack was completed and some Japanese experiments were successfully performed. • In addition to JAXA PL racks, MELFI and ERs were transferred from USlab to JPM. JAXA PL Racks Checkout with Greg FPEF/Marangoni Exp Saibo/CBEF Checkout

  7. INCREMENT 18 OVERVIEW • Ice Crystal Experiments are going well. • From this increment, we are going to start Life Science Experiments (Rad Gene & LOH and Dome Gene). • A series of CGSE CO2 T/S was performed and now we think CGSE can supply CO2 to Saibo Rack. • In addition to JAXA PL racks, MELFI and ERs are in operations. Rad Gene and LOH Dome Gene SCOF/Ice Crystal

  8. SEDA-AP MAXI SMILES INCREMENT 19/20 OVERVIEW • More than 10 experiments are planned in the JPM using both Saibo/Ryutai Racks. • More than 10 experiments are planned in the JPM using both Saibo/Ryutai Racks. • Moreover, from this increment, we will start the first operations on JEM External Payloads (both JAXA and NASA PLs). • More than 10 experiments are planned in the JPM using both Saibo/Ryutai Racks. • Moreover, from this increment, we will start the first operations on JEM External Payloads (both JAXA and NASA PLs). • In addition to JAXA PL racks, MELFI and ERs are getting into full swing. • There may be some simultaneous operations constraints based on the JEM stage analysis. • The number of crewmember will be increased. Microbe-I Rad Silk Space Seed JAXA PCG FACET Marangoni Exp 3

  9. JAXA Utilization Overview (Based on Final OOS Input) Dock Crew Activity Undock KEY MILESTONES 17A Dock (8/8) 2J/A Dock (6/15) 17S Undock (4/5) 17A Undock (8/17) 2J/A Undock (6/26) 20S Dock (10/2) 18S Undock (10/11) 19S Dock (5/29) 18S Relocate (7/20) 32PUndock (4/20) 34P dock (7/26) 34PUndock (9/29) 33PDock (4/26) 33PUndock (7/17) HTV1 Berth (9/8) HTV1 Undock (10/7) Ryutai Rack Cell Rotation Cell Setup/MLT On MLT Off Facet Canister Detachment Canister Attachment JAXA PCG FPEF Experiment Cell Setup /MLT On VRU Exchange Increment 19/20 VRUExchange FPEF Experiment Cell Setup Marangoni Saibo Rack CBEF/CB Maintenance CB/CBEFCL-UP MEUAttachment / Detachment SaiboMaintenance Rad Silk Sanita Swab Watering / MELFI Sample Replacement Microbe ELTC/O PEUAttachment Short Exp Space Seed EPO3/Dewey’s ForestSetup Small PL EPO3/ Moon Score EPO3/ Moon Score EPO3/ Moon Score EPO3 Biological Rhythms (FE1) Biological Rhythms Biological Rhythms (FE2) PADLESSetup PADLES HDTV C/O PADLESRemoval CM JAXA-CM1/CM2 SEDA-AP External PL MAXI SMILES

  10. JAXA PL OPS STRUCTURE (Inc 19/20) NASA/POIC Cadre POD Exposed Facility Payload Officer (ExPO) <Exposed> JEM Exposed Payload Operations SEDA-AP Operator MAXI Operator SMILES Operator (after Flt HTV1) Technical Support* (SEDA-AP, MAXI, SMILES) New PL FCTs for JAXA Exposed Payload Operations POIC SSIPC/MCR SSIPC/UOA (Cadre) J-FLIGHT JEM Payload Officer (JEM PAYLOADS) JFCT (FLAT,CANSEI, J-PLAN,J-COM, Tsukuba-GC, SENIN, ARIES, KIBOTT) Payload Ground System Officer* SSIPC/ESR JAXA System/Payload Safety * JAXA Payload Ops Conductor (JPOC) Rack Officer (BIO/FISICS) <Pressurized> JEM Pressurized Payload Operations Rack Operator (BIO/FISICS) Technical Support* (BIO/FISICS) User Integrator (BIO/FISICS) *IPU-G Operator *On-call

  11. Kenji Noguchi JEM Payload FCT Members (for Inc 19/20)As of January, 2009 JEM PAYLOADS (JEM Payload Officer) PL OPS MANAGER <Off Console> JAXA Inc Scientist JAXA PL Inc Manager Increment Lead Ryoji Kobayashi Shimpei Takahashi Takehiko Ishikawa Kunihiro “Kuni” Matsumoto Keiichiro “JJ” Sakagami Exposed Payload Lead Keiji Murakami Chikara “Rickey” Harada Masayuki Goto Exposed Payload Ops Team Kyoichi Arakane Toru Mori Kensuke Teranishi Hideyuki Watanebe Position Lead for Inc. 19/20 FISICS (FluId ScIence and Crystalization Science Ops Lead) BIO (BIology Ops Lead) JPOC (JAXA Payload Ops Conductor) RO (Rack Officer) RO (Rack Officer) Daisuke Masuda Waka Nishikawa Ryoichi Kumagai Misako Nomura Yuki Kawai Takahiro Sato Hideo Usui Makoto Furukawa Takao Wakatsuki Satoshi “Gucci” Kawaguchi Kenta Kinoshita Kazue Ueyama Aakane Imamura Chie Inoue Takuya Takami Yukiko Abe OP (Operator) 11 Go Hyakutake Yusuke Ohkawa Kuniko “Nicky” Okada Hideki Nagata Yuuta Iwahana Makoto Watanabe Hiroya Koike Yuhei Suzuki Yuusuke Warashina Shusuke Ochiai

  12. Kenji Noguchi JEM Payload FCT Members (for Inc 19/20)As of January, 2009 JEM PAYLOADS (JEM Payload Officer) PL OPS MANAGER <Off Console> JAXA Inc Scientist JAXA PL Inc Manager Increment Lead Ryoji Kobayashi Shimpei Takahashi Takehiko Ishikawa Kunihiro “Kuni” Matsumoto Keiichiro “JJ” Sakagami Exposed Payload Lead Keiji Murakami Chikara “Rickey” Harada Masayuki Goto Pressurized Payload Ops Team Kyoichi Arakane Toru Mori Kensuke Teranishi Hideyuki Watanebe Position Lead for Inc. 19/20 JPOC (JAXA Payload Ops Conductor) ExPO (Exposed Payload Officer) Makoto Furukawa Takao Wakatsuki Daichi SAKOH OP (Operator) SEDA-AP MAXI SMILES Takuya Takami 12 Kuniko “Nicky” Okada Go Hyakutake

  13. ROLES & RESPONSIBILITIES

  14. JAXA PAYLOAD OPERATIONS TEAM User Operations Area (UOA) 14

  15. BACKUP CHARTS • HOSC/SSIPC NEW GATEWAY • JAXA ACTIVITY OV (INC 19/20) • RACK TOPOLOGY IN THE JPM

  16. HOSC/SSIPC NEW GATEWAY BACKGROUND • It took too long time to complete Fluid Physics Experiment because the video to downlink from the IPU was more than we expected. • The HDTV System has been developed. • Bandwidth of all Ku band became 150Mbps. • Trans-Pacific goes down in price. Present ICD MSFC TKSC PDSS OCS 23.5Mbps GW GW >43.0Mbps Trans-Pacific Receive Capability:23.5Mbps Demand PDH Data: 0.5Mbps Mid Rate Data of Payload: 3.0Mbps All Ku band 150.0Mbps IPU realtime video: 43.0Mbps HDTV:27.0Mbps 23.5Mbps It is impossible to downlink realtimely.

  17. HOSC/SSIPC NEW GATEWAY Purposes for new Gateway are... • To downlink the video of the IPU in realtime to SSIPC at the maximum rate (43 Mbps). • To downlink the HDTV in realtime to SSIPC MSFC TKSC IPU or HDTV >43.0Mbps PDSS newGW newGW OCS PDH & Mid Rate GW GW Trans-Pacific Receive Capability:23.5Mbps

  18. PLAN OF NEW GATEWAY New Gateway APID 1210 JEM IPU Bitstream APS HCOR HRFM FDS @WSTF PDSS @MSTF IPU-G @TKSC IPU User Ch.2 APID 1210 b/s Pkt APID 1210 VCID 26 MPC Bitstream HDTV User PDH Ch.6 VCID 26 VCID 26? OCS @TKSC PL User APID 1200,1201 APID 1200, 1201, XXXX, YYYY MAXI PEHG MAXI User APID XXXX VCID 26? Ch.8 SMILES SMILES User APID YYYY US LAB JSC VCID 18 Note For JAXA Commercial in March, the HDTV will reach JSC. b/s b/s MPC Bitstream Ch.2 VCID 18 • In March 2009, the New Gateway will be installed and tested for communication interface. • In April 2009, the New Gateway will start to be operated for JAXA payload.

  19. JAXA Activity OV (as of JAN 21, 2009) ICS C/O [Ground] ICS Voice Func C/O CGSE(Ar) JAXA PCG Marangoni EXP FACET Microbe Rad Silk Space Seed Biological Rhythms(FE-1) Commercial Area Dosimeter Biological Rhythms(FE-2) HDTV C/O SAMS @ER4 SDRM @ER5 JAXA Payload hours: Red:<=1hrsYellow:1–4hrs Green:>=5hrs Microbe SDRAM JEMRMS Ops HTV Ops ICS C/O PROX C/O Road To 2J/A CGSE OPS MELFI SAMS HDTV Space Seed Marangoni EXP FACET Rad Silk JAXA PCG Holter ECG Area PADLES EPO2 Commercial USOS Maintenance P/L Stowage Recon JAXA Maintenance JAXA P/L Maintenance HTV 9/8 10/8 8/8 8/17 5/17 5/28 X2R8:7/6-9 RS EVA #22 6/5 RS EVA #23 6/10 2J/A 17A 32P undock 4/21 33P dock 4/26 19S dock 5/29 33P undock 7/10(TBD) 18S reloc 7/20 34P dock 7/26 34P undock 9/29 18S dock 3/27 17S undock 4/5 20S dock 10/2 18S undock 10/11 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 ISS CDR (Gennady Padalka) FE-1 (Mike Barratt) Exp18 FE-2 (K. Wakata) Exp18 FE-2 (Tim Kopra) FE-2 (Nicole Stott) FE-3 (Roman Romanenko) FE-4 (Robert Thirsk) FE-5 (Frank DeWinne) SYSTEM JEMRMS PROX C/O#3 PROX C/O#4 HTV Ops Road to 2J/A PAYLOAD RYUTAI SAIBO CBEF/CB Maintenance CBEF/CB Cleanup Others EPO3 P/L Stowage Rcn P/L Stowage Rcn Ext P/L SEDA-AP and MAXI C/O & Ops [Ground] SMILES C/O & Ops [Ground] Gas Trap Ops ATCS Refill Gas Trap Ops Maintenance Windows Inspect Fire Alarm Indct C/O ATCS Sample ATCS Sample ELPS Check Hatch Seal Inspect PEPS QDMA PEPS Audit PEPS QDMA PEPS PEPS Hatch Seal Inspect THC A HEPA R&R THC B HEPA R&R JPM/JLP MESHCVR/IMV GRILL/DIFFUSER CLN (Weekly) US P/L in JEM HREP [Ground] MELFI Dewar 1, 2, 3 @ -95C and Dewar 4 @ +2 OPS in JPM Wk 1 4/6 Wk 2 4/13 Wk 3 4/20 Wk 4 4/27 Wk 5 5/4 Wk 6 5/11 Wk 12 6/22 Wk 7 5/18 Wk 8 5/25 Wk 9 6/1 Wk 10 6/8 Wk 11 6/15 Wk 13 6/29 Wk 14 7/6 Wk 15 7/13 Wk 16 7/20 Wk 17 7/27 Wk 18 8/3 Wk 19 8/10 Wk 20 8/17 Wk 21 8/24 Wk 22 8/31 Wk 23 9/7 Wk 24 9/14 Wk 25 9/21 Wk 26 9/28 Wk 27 10/5 WEEKS (beginning) Shuttle/Soyuz Dock/Undock Progress Dock/Undock Holiday RS EVA HTV

  20. RACK TOPOLOGY IN THE JPM System Rack *This rack is configured according to Inc19,20 IDRD (draft). Hard / Soft Dummy panel NASA allocation Stowage location