CSS Georgia Ordnance . 1863 Inventory of Guns 1 EA - 6 Pounder 3 EA – 8-Inch Shell Guns 2 EA – 9-Inch Shell Guns 1 EA – 24-Pounder 4 EA – 32-Pounder Rifles 1986 Dive Operations – Recovered Items 1 EA – 24-Pounder 1EA – 32 Pounder Rifle
E N D
CSS Georgia Ordnance 1863 Inventory of Guns 1 EA - 6 Pounder 3 EA – 8-Inch Shell Guns 2 EA – 9-Inch Shell Guns 1 EA – 24-Pounder 4 EA – 32-Pounder Rifles 1986 Dive Operations – Recovered Items 1 EA – 24-Pounder 1EA – 32 Pounder Rifle Assorted Brooke Projectiles, Percussion Fuses and Spherical Shot Known Remaining Guns in the Debris Field 2 EA – 32 Pounder Rifles 1 EA – No. 1 Cannon (On Inventory Listed as an 8-Inch Shell Gun)
New Savannah Bluff Lock & Dam Fish Passage Work performed by Augusta, GA 150 Miles Savannah Harbor
McCoys Cut Diversion Structure Flow Re-Routing Work performed by
Raw Water Storage Impoundment Work performed by
Selected Plan (47-foot alternative) is well justified Benefit to Cost Ratio of 5.5 to 1 Project First Cost $652 M at FY 12 levels yields $174 M in total annual benefits Annual O&M costs increase from $22 M to $27 M Environmental impacts would be mitigated to an acceptable level Developed a comprehensive mitigation plan ($311M or 47% of project cost) Includes extensive monitoring and adaptive management SHEP supports the Administration’s priorities of being protective of the environment, improving infrastructure, creating jobs, and maintaining global competitiveness ASA(CW) signed ROD on 26 October 2012 Need Congress to adjust 902 limit and signed PPA before construction can begin Designs for first features underway Summary
Learn more on our website: www.sas.usace.army.mil