DAQ Installation. Computers Front-end computers installed Midas installed Network (GigaBit to PSI Network: Sept. 06 ) UPS: Oct. 06 Electronics VME crates & Interfaces DRS boards 50 VME boards (out of 100) already delivered
E N D
DAQ Installation • Computers • Front-end computers installed • Midas installed • Network (GigaBit to PSI Network: Sept. 06) • UPS: Oct. 06 • Electronics • VME crates & Interfaces • DRS boards • 50 VME boards (out of 100) already delivered • DRS mezzanine boards in production until Sept. 06 • DRS3 already arrived, but no time to test …
Plans • August 10th – 20th • Get SCS-2000 working as much as possible • Do acceptance test of DRS mezzanine board (new PCB) with one prototype, then start mass production (200 boards) • Set-up test facility for DRS2 chips, needed for mass production (chips from factory are untested!) • Design auxiliary board to interface to trigger bus • September 10th - End October • Assemble and install final DRS boards in area (the board installation is rather quick and can be done on a Wednesday) • Partial system probably ready by beginning of October, full system maybe by end of October, depends on external assembly company • Calibrate all DRS boards in the area (can now be done automatically) • Optimize readout speed DAQ should be ready sometime in October 06