40 likes | 53 Views
Johnny Ng FLASH Coll. Mtg. 7/25/03. FLASH DAQ. Status Task list Summary. Status. New PC (Windows XP) installed Stable and faster operations Could run while network is connected Readout of new FLASH toroid working Digital scope readout ~ 2 Hz (vs. <1 Hz in T-461)
E N D
Johnny Ng FLASH Coll. Mtg. 7/25/03 FLASH DAQ • Status • Task list • Summary
Status • New PC (Windows XP) installed • Stable and faster operations • Could run while network is connected • Readout of new FLASH toroid working • Digital scope readout ~ 2 Hz (vs. <1 Hz in T-461) • Online/real-time analysis (See Kevin’s talk)
Task List • User-friendly online/real-time analysis (Kevin) • Electronic log-book • Need volunteer • Integrate Beam Profile Monitor (C.W.Chen et al.) • Integrate Filter-wheel control and monitor (Kevin & Stan)
Summary • Existing (T-461) system improved • New features (to be) added (unless we’re happy with “pen & paper” technology) • New systems to be integrated (Gas system will probably be the same as before.)