1 / 7

GPS L5

GPS L5. Dr. Chris Hegarty L2/L5 Industry Day May 2, 2001. 1. Background. 1996 - GPS Presidential Decision Directive (PDD) Comprehensive national policy on GPS and augmentations Interagency GPS Executive Board (IGEB) established

gareth
Download Presentation

GPS L5

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GPS L5 Dr. Chris Hegarty L2/L5 Industry Day May 2, 2001 1

  2. Background • 1996 - GPS Presidential Decision Directive (PDD) • Comprehensive national policy on GPS and augmentations • Interagency GPS Executive Board (IGEB) established • February 1997 - Department of Defense (DoD) and Department of Transportation (DoT) agree to provide a second civil GPS frequency • March 1998 - VP Gore announces IGEB decision to implement two new civil signals • January 1999 - VP Gore announces third civil signal frequency selection - 1176.45 MHz

  3. Background (continued) • February 1999 - IGEB Third Civil Signal Implementation Steering Group formed • Established relationship between IGEB and RTCA for development of L5 signal requirements • November 1999 - IGEB report Implementation of a Third Civil GPS Signal completed • Recommended implementing L5 with: • 6 dB higher minimum received signal power than L1 C/A code • 10.23 Mchip/second spreading codes on quadrature channels (no data on one channel) • Other recommendations regarding coexistence of L5 with existing systems operating at/near 1176.45 MHz • Link 16 • Distance Measuring Equipment (DME)/Tactical Air Navigation (TACAN)

  4. Feb. - Nov. ‘99 IGEB Organization Interagency GPS Executive Board (IGEB) Executive Secretariat Third GPS Signal Implementation Steering Group WG 2 WG 3 WG 4 WG 1 Technical Feasibility of Coexistence Cost Issues/ Operational Impacts Signal Requirements International Coordination RTCA, Inc (SC 159 WG1) GPS WP8D GPS International Outreach Group

  5. Current IGEB L5 Activities • Working Group 1 -Validation of Coexistence • Addresses follow-on work recommendations from Nov. 1999 IGEB report • Co-chaired by Dr. Hegarty (MITRE)/Mr. Williams (JSC) • Working Group 2 – L5 Signal Specification • Chaired by Dr. Hegarty (MITRE)

  6. Present IGEB Organization Interagency GPS Executive Board (IGEB) Senior Steering Group Executive Secretariat WG 1 WG 2 Validation of Coexistence Signal Specification RTCA, Inc (SC 159 WG1)

  7. L5 Signal Specification Schedule • December 2000 • RTCA Program Management Committee (PMC) approved L5 Signal Specification • Received formal civil coordination through the extended DOT Positioning/Navigation Executive Committee, with all agencies concurring • February 2001 - DoD review completed and comments provided to DOT • April 2001 - DOT response to comments • October 2001 - Threshold date for 1st release of Interface Control Document (ICD) GPS-705

More Related