1 / 3

Human resources MSC

Human resources MSC. Human resources. SCD ( conductor): L . Oberli (cable development), EN/MME design office T. Sahner MDT (short model) - 11 T project core team M . Karppinen , D . Smekens (short magnet design and coordination) J . Mazet (coil fabrication),

gareth
Download Presentation

Human resources MSC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Human resources MSC G. De Rijk CERN TE-MSC

  2. Human resources SCD (conductor): L. Oberli (cable development), EN/MME design office T. Sahner MDT (short model) - 11 T project core team M. Karppinen , D. Smekens (short magnet design and coordination) J. Mazet (coil fabrication), T. Lyon (FEA), - MDT engineering support S. Izquierdo Bermudez (quench analysis), G. Kirby (collar & yoke procurement), G. De Rijk CERN TE-MSC

  3. Human resources - MDT lab ‘poles’ J-C. Perez (tooling and shell procurement), J. Mazet (coil fabrication), C. Fernandes (coil winding), R. Gauthier (impregnation), D. Cote G. Maury N. Bourcey (reaction) L. Lambert (part manufacturing) C. Loeffler N. Schmid (+ FSU support ~7 people) LMF (Long magnet Facility) F. Lackner (welding trials, CM assembly), R. Moron-Ballester (5.5-m-longtooling), G. De Rijk CERN TE-MSC

More Related