150 likes | 294 Views
JKO Mobile IPR Build 3 17 February 2014. Agenda. Executive Summary Approach Build 2 schedule and line items Build 3 schedule and line items Program Management. JKO Mobile Executive Summary (as of: 17 Feb 14). Task Order 180 Period of Performance ends 10 July 2014
E N D
Agenda • Executive Summary • Approach • Build 2 schedule and line items • Build 3 schedule and line items • Program Management
JKO Mobile Executive Summary(as of: 17 Feb 14) • Task Order 180 Period of Performance ends 10 July 2014 • Build 2 work required bug fixes and enhancements: • JKO Mobile App: • 3 bugs • 3 enhancements (one deferred to Build 3) • M-Learning Suite: • 10 bugs (five deferred to Build 3) • Total: 16 items, 10 delivered. Six items were deferred to Build 3. • Build 3 work: • JKO Mobile App: • 8 bugs • 5 enhancements (one originally scheduled for Build 2) • M-Learning Suite: • 11 bugs (five originally scheduled for Build 2) • 3 enhancements • Total: 27 items - 19 bugs, 8 enhancements
Approach JKO Systems Engineering Process Transition Moves a system element to the next development stage or to the user. Stakeholder Requirements Definition Translates stakeholder needs into technical requirements. Validation Confirms that system elements meet stakeholder requirements. Verification Requirements Analysis Confirms that system elements meet design-to or build-to specifications. Improves understanding of requirements and their functional relationships. Realized Solution Solution Specified Design Integration Incorporates lower-level system elements into higher-level ones. Architecture Design Implementation Develops alternative design solutions, physical architectures and selects final design. Creates (making, buying, or reusing) low-level system elements.
Review of Build 2 Work Schedule Mobile App Bugs/Enhancements M-Learning Suite Bugs/Enhancements
Knowledge as a force multiplier JKO Mobile Development Timeline – Build 2 (as of 17 Feb 2014) Green= Complete, Yellow= In progress, Red= Off schedule, Black = Not started
Review of Build 3 Work Schedule Mobile App Bugs/Enhancements M-Learning Suite Bugs/Enhancements
Knowledge as a force multiplier JKO Mobile Development Timeline – Build 3 (as of 17 Feb 14) Green= Complete, Yellow= In progress, Red= Off schedule, Black = Not started
Program Management(as of: 17 Feb 14) • Weekly updates at JSSM • A line item slide will be provided with percentages alongside each line item to monitor progress • Monthly updates at Production Brief • IPRs held monthly