Continental Crossings. Presented by: Avery Bang Team Members: Irund A-wan Jenna Kusmierek Tara Olds Ryan Wallace. Peruvian Bridge Project Proposal. Team Members. Project Manager: Avery Bang. Design Engineers: Irund A-Wan Jenna Kusmierek Tara Olds Ryan Wallace. Project Site.
E N D
Continental Crossings Presented by: Avery Bang Team Members: Irund A-wan Jenna Kusmierek Tara Olds Ryan Wallace Peruvian Bridge Project Proposal
Team Members Project Manager: Avery Bang • Design Engineers: • Irund A-Wan • Jenna Kusmierek • Tara Olds • Ryan Wallace
Project Site • Bridge location • Bridge location Google Earth image of South America Google Earth image at Eye Altitude of 15 km
Project Introduction • Location: Yavina, Peru • Current Crossing Unsafe • Enable School Access
Design Objectives • Design Standardized Footbridge • Structural Members • Abutments • Connections • Bridge Approach • Site Layout • Satisfy International Design Codes • Select Only Local Materials • Construction Schedule
Design Challenges • Topography • Flood Plain Elevation Restrictions • Data Collection Accuracy • Approval of Design • Feasibility of Construction • Funding
Project Design Tasks • Hydraulic Consideration • Structural • Abutments • Connections • Construction Phasing
Importance Factors • Constructability • Site Constraints • Materials • Cultural Aspects • Sustainability • Engineering Effort
Partners • Bridges to Prosperity: USA Organization • Site Selection • Developing World Design Experience • Shoemaker & Haaland: Local Engineers • P.E. Consultants • Technical Expertise • CADEP: Peruvian Organization • ArrangeLocal Labor • Facilitate Material transport to site
Summary • Need for Bridge • Safety Concerns • Technical Design Knowledge • Design Challenges • Location • Construction • Process and Collaborations • International • Various Partnerships • Project Completion