1 / 2

Calibrazioni offline & MC tuning RPC ATLAS

Calibrazioni offline & MC tuning RPC ATLAS. Dimostrata risoluzione dT =2 ns. T iming migliore di tutto ATLAS. Efficienze RPC misurate nel 2011 migliori di quelle del 2010 ( successo degli interventi mirati in caverna )

Download Presentation

Calibrazioni offline & MC tuning RPC ATLAS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Calibrazioni offline & MC tuning RPC ATLAS DimostratarisoluzionedT=2 ns. Timing migliore di tutto ATLAS. • Efficienze RPC misuratenel2011 migliori di quelle del 2010 (successodegliinterventimirati in caverna) • Time, Efficienze, Cluster Size, Noise input alleSimulazioni • Algoritmi di misuraverificati con simulazioni Calibrazione offline e Monte Carlo RPC ATLAS responsabilita’ di Lecce

  2. Multichannel TDC and fast timing tracker Studio di fattibilita’ presentato a ATLAS. Interessemostrato dal gruppo RPC per upgrade di fase 2. • CAPTAN BOARD • Dimensioni 6” x 6” • Unica alimentazione 3.3 V • 1GBit/s ethernet link • FPGA Virtex4 • Bus verticale • Bus orizzontale • Intra-stack Optical link • Intera I/O disponibile Shifted Clock Sampling to boost dT • 360 ps latch capability: • Eight equally shifted DMC at 350 MHz • TDC time width = 360 ps • Time resolution dominated by intrinsic DMC jitter of about 120 ps

More Related