Initial Elementary School Programming Information

Initial Elementary School Programming Information. BFES , DEES, EPES , & HMES Indiana Area School District October 11, 2010. ES Classroom Analysis. District Preference for Class Size Limit: K-3 - 20 students per class 4-5 - 25 students per class. ES Classroom Analysis.

gasha
Download Presentation

Initial Elementary School Programming Information

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Initial Elementary School Programming Information BFES, DEES, EPES, & HMES Indiana Area School District October 11, 2010

  2. ES Classroom Analysis District Preference for Class Size Limit: K-3 - 20 students per class 4-5 - 25 students per class

  3. ES Classroom Analysis Existing Conditions: Level Enroll. # Classes Ratio Range(var.) K 205 11 18.6 16-21 (5) 1 229 13 17.6 15-21 (6) 2 214 12 17.8 15-22 (7) 3 209 11 19.0 15-21 (6) 4 194 10 19.4 17-22 (5) 5 193 9 21.4 18-26 (8) K-5 1,244 66 18.8 average 207.3

  4. ES Classroom Analysis Single Building/Ideal Attendance Areas: Level Enroll. # Classes Ratio Range K 205 11 (0) 18.6 18-19 1 229 12 (-1) 19.1 19-20 2 214 11 (-1) 19.5 19-20 3 209 11 (0) 19.0 19 4 194 8 (-2) 24.2 24-25 5 193 8 (-1) 24.1 24-25 K-5 1,244 61 (-5) 20.4 8 → 1 average 207.3 (-8%)

  5. ES Classroom Analysis Planning for Current Largest Class (w/ideal): Level Enroll. # Classes Ratio K 229* 12 (+1) 18.6 1 229 12 (0) 19.1 2 229 12 (+1) 19.5 3 229 12 (+1) 19.0 4 229 10 (+2) 24.2 5 229 10 (+2) 24.1 K-5 68 (+7) average 229 (+10%) *Largest anticipated class is already past K Level

  6. ES Classroom Analysis Enrollment Projections for Kindergarten: Year 2007 Proj. 2008 Proj. Variance 10-11 199 199 (205 actual) 11-12 198 198 0 12-13 201 164 37 13-14 205 161 44 14-15 209 158 51 15-16 214 154 60 16-17 218 151 67 17-18 222148 74

  7. ES Classroom Analysis • District is Focusing on K-5 • Preferences for Class Size Limits • K-3: 20 students • 4-5: 25 students • Impact of Attendance Areas • Current class size varies – from 5 to 8 per class per grade • Current Arrangement reduces K-5 capacity by about 8% from “ideal”

  8. ES Classroom Analysis 4. Impact of Class Size • Providing for existing large class “bubbles” impacts capacity by about 10% 5. Planning Capacity • 8% + 10% ≈ 20% 6. Anticipated K-5 Class Size • Current Average: 207.3 (183-229) • Projection Range: 148-222 • Planning Size: ? 210? 220?

  9. ES Classroom Configuration Configuration Options – “Clean Slate”

  10. ES Classroom Configuration Configuration Option – “As Is” Notes: EPES: needs +1 clssrm for 4/3 configuration HMES: needs +1 clssrm for 3/2 DEES & HMES: each need a room revised for K DEES: modular classrooms BFES: undersized & basement rooms

  11. ES Classroom Configuration Configuration Option – Close 1 Smaller School Capacity Notes: EPES & HMES: assumes +1 classroom (other issues persist) Assumes that maximum capacity could be met with static attendance areas Significant number of classrooms would exceed preferred 20/25 class size limit – at least in the short term if latest projections are correct

  12. ES Classroom Configuration Configuration Option – Close 1, Expand BFES Capacity Notes: EPES & HMES: assumes +1 classroom (other issues persist) BFES: adds 4 classrooms Likely some classrooms would exceed preferred 20/25 class size limit – at least in the short term if latest projections are correct To further increase capacity: further expand BFES or expand EPES?

  13. ES Classroom Configuration Configuration Option – Close 2, Expand 2

  14. ES Classroom Configuration BFES Options to Explore • 4/4 ≈ 520 (416) students (4 ES’s) • 5/4 ≈ 600 (480) students (3 ES’s) • 6/5 ≈ 730 (584) students (2 ES’s) • Other Options? • 4/3 ≈ 470 (376) students? (4 ES’s: more work at other ES’s) • 7/6 ≈ 860 (688) students? (2 ES’s: less work at EPES)

  15. ES Classroom Configuration

  16. BFES Essential Items – Group 1 4 Repair/replace slabs, rails, curbing, window wells $30,000 - $65,000 14.1 Re-point brick $90,000 - $120,000 19 Replace interior doors & modify openings $80,000 - $95,000 20.1 Renovate toilet rooms for ADA $240,000 - $290,000 21.2 Modify/replace stair guardrails $20,000 - $30,000 23.2 Replace 9x9 floor tile with VCT $23,000 - $35,000 25.1 ADA access to end basement rooms $120,000 - $180,000 25.2 ADA access to middle wing & basement $150,000 - $220,000 25.3 ADA access to MPR stage $35,000 - $100,000 27 Add sprinkler system (cost not included in DWFS)$160,000 - $260,000 28 Renovate HVAC systems $750,000 - $850,000 Hard Costs (including 10% Design Contingency): $1,870,000 - $2,470,000

  17. BFES Essential Items – Group 2 14.2 Re-caulk the EFIS $6,000 - $12,000 17 Replace roof membrane & edge materials $290,000 - $370,000 21.1 Replace stair handrails $6,000 - $7,500 24.1 Replace selected suspended tile ceilings $110,000 - $166,000 24.3 Replace ceilings in basement rooms $16,000 - $20,000 26 Renovate plumbing systems $320,000 - $380,000 29.3 Provide lighting protection system $30,000 - $50,000 Hard Costs (including 10% Design Contingency): $860,000 - $1,110,000

  18. BFES Essential Items – Group 3 1 Clear basins, address site drainage issues $2,000 - $25,000 2 Review parking lot light levels $0 - $15,000 20.5 Replace student lockers $260,000 - $320,000 21.4 Modify stair at middle classroom wing $10,000 - $15,000 29.1 Provide automated lighting control system $30,000 - $60,000 29.4 Provide additional receptacles $30,000 - $50,000 Hard Costs (including 10% Design Contingency): $370,000 - $530,000

  19. BFES Desirable Items 3. Miscellaneous playgrounds/playfields improvements $35,000 - $60,000 5. Repave and restripe access drives $50,000 - $75,000 6. Repave and restripe parking $40,000 - $60,000 7. New landscaping materials $10,000 - $30,000 8. Add benches/trash receptacles and repair fencing $6,000 - $15,000 11. Repair cracks in retaining walls $5,000 - $7,000 14.3 Replace coping $16,000 - $22,000 15. Repair window screens $1,200 - $2,200 16. Replace exterior door weather stripping $3,000 - $4,800 20.2 Provide ADA interior signage $5,500 - $7,000 20.3 Replace display boards $21,000 - $25,000 20.4 Repair/replace display cases $10,000 - $15,000 20.6 Replace cabinetry at the stage in MPR $18,000 - $26,000 20.7 Repair/replace casework/countertops in art room$18,000 - $26,000 21.3 Repair stair treads $2,500 - $3,800 22 Repair/repaint selected wall areas $65,000 - $98,000 23.1 Replace older carpet $39,000 - $58,000 23.3 Repair/replace wood stage flooring $10,000 - $30,000 23.4 Replace walk off mats $24,000 - $29,000 24.2 Repair/repaint plaster ceilings $24,000 - $30,000 29.2 Replace lighting fixtures $100,000 - $200,000 Hard Costs (including 10% Design Contingency): $550,000 - $910,000

  20. BFES Summary of Costs • Essential Items – Group 1 • Total Project Costs: $2,530,000 - $3,530,000* • Essential Items – Groups 1 & 2 • Total Project Costs: $3,480,000 - $4,580,000 • Essential Items (All Groups) • Total Project Costs: $3,960,000 - $5,260,000 • Essential And Desirable Items • Total Project Costs:$4,660,000 - $6,430,000 *cost for sprinklers not listed in DWFS