An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ANU Injection & Abort Lines ANU Extraction Line and RR30 Dave Johnson Meiqin Xiao March 19, 2007 ANU Inject & Abort dej

  2. Injection Line Motivation Layout Modifications to 8 GeV line Modifications to Recycler Lattice MI8 to Recycler MI8 to MI /mini-Boone Aperture Recycler Injection Magnets Power Supplies Instrumentation Abort Line Existing Lattice Recycler modifications Kicker Strength/Trajectories Kick Errors Aperture Summary 1531-v1 Magnet and Instrumentation Counts for Nova Recycler 1529-v1 Recycler Abort Line with Gap Clearing Kickers for the Nova 1501-v1 Recycler Injection Line Options for the Nova Project 1495-v1 Recycler Injection Kicker Configuration in the Nova 1596-v5 Kicker for PP2 Specifications Outline Related Documents ANU Inject & Abort dej

  3. Motivation • Although the initial solution produced an acceptable optical solution, • it required large ADC magnets to be hung from wide tunnel ceiling over mini-Boone line, • potential field leakage into Recycler. • Features of new design. • hybrid vertical bending (next slide) • use permanent magnets (“easy” installation) • Only 2 powered magnets (switch & Lambertson) • fewer PS, reduced controls, less cable, less cooling, SB area • reduced impact on tunnel utilities (hopefully) • requires new mirror magnet design • requires construction of existing Lambertson design (MLA) ANU Inject & Abort dej

  4. Cartoon of Layout HKICK (1.208 mr) 5 kickers 2 bumpers VLAM (MLA) 13.6 mr (DC) V2 (PDD) 19.2 mr 102 100 103 104 MQT trims Mirror magnets (new) Recycler K QR852 New MQT trims QR853 846 847 HBEND (35 mr) 848 850 849 852 851 MI8 MI 101 103 102 8 Gev line • Modifications to 8 GeV line • 846: • Replace LEP with HDC • Add MQT trim (ramped) • 847: • Replace LEP with VDC • Add MQT trim (ramped) • 848: • Replace LEP with HDC • Add MQT trim (ramped) • Shift BPM upstream • Install ADC 10” downstream of SQA steel • 849: • Shift quad 849 downstream by 80 inches • Move PDD-040 to “upper” line and replace w/ PDD_M mirror magnet Mini-Boone switch magnet SWITCH MAGNET (15 Hz) V1 (ADCW) 32.8 mr • Modifications to Recycler (besides ECOOL removal) • 101: • Move v101 corrector to upstream corrector slot • Design beam pipe from 101 to Lambertson (crotch) • 102: • Move h102 corrector and BPM (hp102) to middle between A & B quad • Install MI beam pipe from Lambertson to Q103 Trim RQMxMQTRQMxMQTRQMXBPMMW ANU Inject & Abort dej

  5. Q846 • Replace LEP with HDC • Add MQT trim (ramped) • Vacuum modifications ANU Inject & Abort dej

  6. Q847 • Replace LEP with VDC • Add MQT trim • Vacuum modifications (require shift SQA ?) ANU Inject & Abort dej

  7. Q848 • Replace LEP with HDC • Add MQT trim • Shift BPM upstream • Vacuum modifications • Install ADC 10” downstream of SQA steel ANU Inject & Abort dej

  8. Summary of Modifications • Modifications to 8 GeV line • 846: • Replace LEP with HDC • Add MQT trim (ramped) • 847: • Replace LEP with VDC • Add MQT trim • 848: • Replace LEP with HDC • Add MQT trim • Shift BPM upstream • Install ADC 10” downstream of SQA steel • 849: • Shift quad 849 downstream by 80 inches • Move PDD-040 to “upper” line and replace w/ PDD_M mirror magnet • Modifications to Recycler (besides ECOOL removal) • 101: • Move v101 corrector to upstream corrector slot • Design beam pipe from 101 to Lambertson (crotch) • 102: • Move h102 corrector and BPM (hp102) to middle between A & B quad • Install MI beam pipe from Lambertson to Q103 ANU Inject & Abort dej

  9. Q848 VLAM K104 Q846 Q102(RR) V(up) VLAM (dn) V(dn) Match into Recycler All PM quads within standard Recycler strength ANU Inject & Abort dej

  10. Match to MI/mini-Boone Q846 Q849 Q851 Q101 Quad trims (ramped) Mini-Boone switch LAM101 (MI) K103 ANU Inject & Abort dej

  11. Min horizontal aperture Vertical aperture Beamline Aperture • Provide for loss free transmission • Expect emittance of 15-20 p (history shows with large tails) • Would like to provide at least 1 s for loss free steering • Assume 99% in 6s with 1%out 8s -> use 10s with 25p beam See next slide ANU Inject & Abort dej

  12. Recycler Injection Lambertson Kickers injection circulating • Nominal 54 mm separation • Inj. Trajectory || to straight , inj. angle provided by Lambertson roll (~5o) • Nominal kick angle 1.208 mr (71.6 G-m) • MLA (field region increase) 44->50mm • MI beam pipe Lambertson->Q103 ANU Inject & Abort dej

  13. Summary of Required Magnets *One from spares and one moved from 8Gev line and replaced with mirror magnet * ANU Inject & Abort dej

  14. Power Supply Summary • Switching Magnet (15 Hz) • Required current: 611 Amps • Magnet resistance 38.4 mOhms • New supply patterned after mini-Boone switcher supply • Lambertson (DC) • Required current (with MLA modification): 396 Amps • Voltage: • Quad trims (15 Hz) • Required current: < 20A • Resistance: 1.6 ohms Inductance: 67 mH • Slew rate: ~400 A/sec • Voltage: 42 V @ 10A max slew rate • Number of channels: 3 • Quad trims (DC) • Required current: < 10 Amps • Voltage: 16 volts • Number of channels: 5 • Dipole trims (DC) • Required current: < 10 Amps • Resistance • Number of channels: 5 new ANU Inject & Abort dej

  15. Instrumentation • Utilize all recycled hardware and electronics (MI, Recycler, RR22, RR32, A1) • Require position measurement for steering/matching (1 bump) • Require profile measurement matching -> Multiwires • Monitor loss (share existing loss monitors while adding a few around strategic places like switch magnets and Lambertsons) - details not yet finalized • IPM (???) where ?? ANU Inject & Abort dej

  16. ABORT LINE ANU Inject & Abort dej

  17. 400 402 Dump LAM402 LAM402 KICKER MI EnclosureWall Existing ABORT LINE • Recycler abort line shares the beam absorber with the MI. • Contains vacuum break downstream of the Lambertson (do we keep ?) • Abort kicker double duty as pbar extraction kicker (pbar function will go away with Nova) • NEW > Want to install gap clearing kickers so the beam in the injection gap is cleanly sent to the absorber Oct 2000 Recycler e-log RR 5 MI • Assume ~5E13/1.33 sec • Assume 2% in gap • 1E12/1.3sec • 1 kW ANU Inject & Abort dej

  18. HT400 HP400 VP400 5 Gap Clearing Kickers Q400B G400A G341A G341B Abort Kicker 2 Bumper Kickers New RR40 Configuration • Move abort kicker between G400A and Q400B • Install Gap clearing kickers downstream of Q400B • Fit to same position at entrance to Lambertson with both kickers-> • difference in angle at entrance to Lambertson 100 ur -> 0.3 mm difference at Lambertson exit • Abort kicker nominal angle 1.07 mr and full turn kicker (>9.5 us) @ 0.77 Hz • Gap clearing: nominal angle 1.18 mr with ~1.6 us flattop / 57ns rise/fall @ 15 Hz ANU Inject & Abort dej

  19. Abort SWIC location Orbits ‘n such Lamb gap clearing abort inside • Closed orbit 22 mm inside • Extraction position 32 mm outside (both) • Phase advance • H: kick-Lam 90o Lam-absorber 180o • V: kick-Lam 90o Lam-absorber 90o • 5% kick error (either) produces 2.7mm displacement at both the Lambertson and absorber. -> set flattop tilt to 4% Closed orbit outside Trajectory with 5% error ANU Inject & Abort dej

  20. Blue-vertical L H V V V Red-horizontal Beam envelope (10s) for 25 p 24” round 4” round H ellipse V ellipse L H V V V 24” round 4” round H ellipse V ellipse Apertures • Abort line contains both elliptical and round beam pipe (4”) • Several tight spots for 10s of 25p • Comfortable for 6s • Modify envelope (?) with trim quads Beam envelope (6s) for 25 p ANU Inject & Abort dej

  21. Extracted beam Lambertson Aperture • Cross section of Recycler beam pipe (thru Q402 upstream of Lambertson) and Lambertson aperture • No problem with commissioning beam • Big beam- tight • Replace Recycler beam pipe (401-402) with MI ellipse • Lambertson remains tight for 10s 25p Big Beam (25p) Commissioning Beam (10p) Approx MI pipe ANU Inject & Abort dej

  22. Summary • Injection Line Design Finalized • Required magnets and fields specified • Abort geometry and Kicker strengths specified • 3D Model of each Injection and Extraction areas • (\\beamssrv1\mechdrft\public\meiqin) • Next steps: • Look at tunnel /utility interferences • Verify modifications to existing beamlines • Stand design • Vacuum system design ANU Inject & Abort dej