130 likes | 442 Views
Condensate Trap Heater KGAHT0201KIT. 2013 Fall Zone Meeting Gary Georgette/Jerry Shipman. KGAHT0201CFP. Kit Contents: Condensate trap with heat pad installed Includes: Low voltage harness External thermostat 115 VAC to 24 VAC Step-down transformer Trap grommet
E N D
Condensate Trap HeaterKGAHT0201KIT 2013 Fall Zone Meeting Gary Georgette/Jerry Shipman UTC Climate, Controls & Security Confidential and Proprietary Information - Not for Further Distribution
KGAHT0201CFP • Kit Contents: • Condensate trap with heat pad installed • Includes: • Low voltage harness • External thermostat • 115 VAC to 24 VAC Step-down transformer • Trap grommet • Horizontal direct vent installations • 7/8-in. casing knockout grommet UTC Climate, Controls & Security Confidential and Proprietary Information - Not for Further Distribution
Kit Contents-Trap Heater Heat pad is factory-applied and wraps around the entire trap assembly Low voltage harness & transformer leads External thermostat UTC Climate, Controls & Security Confidential and Proprietary Information - Not for Further Distribution
Kit Contents-Transformer 115 VAC, Neutral & Ground Leads UL Label Low Voltage Screw Terminals Mounting Screw UTC Climate, Controls & Security Confidential and Proprietary Information - Not for Further Distribution
Kit Contents-Grommets 7/8-in. Casing Knockout Grommets Trap Grommet UTC Climate, Controls & Security Confidential and Proprietary Information - Not for Further Distribution
Basic Wiring Diagram UTC Climate, Controls & Security Confidential and Proprietary Information - Not for Further Distribution
Basic Installation • Remove factory trap from furnace • Install trap from kit on furnace • Remove (2) 7/8-in. knockouts on same side of furnace • Install transformer from kit on field-supplied J-box • Mount J-box to knockout on furnace casing • Install 7/8-in. grommet through knockout for J-box/furnace casing UTC Climate, Controls & Security Confidential and Proprietary Information - Not for Further Distribution
Basic Installation • Route external 115 VAC power leads and furnace power leads to J-box • Use external disconnect when required by code • Connect external, furnace and transformer leads together • Install 7/8-in. grommet in other 7/8-in. knockout in casing • Route trap heater leads under inducer assembly and through that grommet in casing • Verify trap heater leads are not touching hot surfaces • Connect low voltage leads to screw terminals on transformer UTC Climate, Controls & Security Confidential and Proprietary Information - Not for Further Distribution
Trap Heater Installed UTC Climate, Controls & Security Confidential and Proprietary Information - Not for Further Distribution
External Connections Low Voltage Leads & Casing Grommet Secure Excess Wire & Connect to Transformer Furnace Line Voltage Power Leads & Casing Grommet Complete Line Voltage Connections In J Box UTC Climate, Controls & Security Confidential and Proprietary Information - Not for Further Distribution
Conclusion • It’s quick • It’s easy • Instructions on HVACpartners • AG-KGAHT-01 • Questions? UTC Climate, Controls & Security Confidential and Proprietary Information - Not for Further Distribution