An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IE 201 INTRODUCTION TO ENGINEERING DESIGN

  2. L-3d Presentation Team 5 Abdullah AbuKhwejah Abdullah Siami Adam Jalal Rami Almatani Mohamed AlShayea

  3. Agenda • Context 1 min • The work 1 min • KTSA 1 min • GANTT CHART 1 min • ARTIFACT SKETCHES 1 min • Discussion 1 min

  4. Introduction: This is the fourth installment of the IE 201 project which is L3-D (implementation). This step comes right after we have selected the artifact which is to obtain, dissect the artifact and prepare for the final step. In this assignment we will apply the KTSA on the artifact and develop a (Gantt chart) that shows when the tasks will be completed. Finally we will sketch our artifact parts after dissection and shall number the parts so that it will be easy for us to put back together.

  5. We first apply the Kepner-Tregoe Situation Analysis KTSA on the artifact that we obtained from the previous assignment which is Bicycle to help us prioritize the tasks and activities that remain to be completed. The Work:

  6. - The table below shows the KTDA for our implementation problems

  7. Now, after applying the KTDA we need to have a Gantt Chart toshow when the tasks will be completed. It lets us know who is working on each task and how long it will take.

  8. - The table below represents a Gantt Chart for our implementation procedure.

  9. Now, we go for the artifact parts' sketches. After we dissected the Bicycle we made sketches for each part followed by a number and its name to make it easy when we put back together.

  10. Discussion: We have come to the end of the assignment L3-D (implementation) which was the fourth assignment for this project. It contained firstly, the KTSA table and results, secondly we used the results and added them to a Gantt chart which helped us figure out who was doing what and how long it would take to achieve. And last but not least we drew some sketches of the parts after dissection to artifact, and we numbered the parts so that it would be easier to put back together. We look forward to the final part of the project L3-E.