An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NOTICE! These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer Science and Engineering, University of Mälardalen, Västerås, Sweden and at the Faculty of Electrical Engineering and Computing, University of Zagreb, Croatia (year 2009/2010). For all other purposes, authors’ written permission is needed! The purpose of these materials is to help students in better understanding of lectures in DSD and not their replacement! 9/23/2009

  2. Distributed Software Development 9/23/2009

  3. WikiPres@MdH Project Plan Satish Jaiswal 9/23/2009

  4. Overview • Project Background • Milestones • Plan for milestones • Development Methodology • Deliverables • Activity Plan • Financial Plan • Project Risks 9/23/2009

  5. Project Background SCREEN SHOTS Java Plug-in User Comments: This slide is really good ODP FILE Web Page ODP – Open Document Presentation Comments in database SENARIO 1 9/23/2009

  6. Project Background User(s) makes changes in the presentations WIKI ENGINE Java Plug-in Java Plug-in ODP FILE Web page ODP – Open Document Presentation SENARIO 2 MODIFIED OPD 9/23/2009

  7. Project Background User(s) makes changes in the presentations WIKI ENGINE Java Plug-in Java Plug-in ODP FILE Web page ODP – Open Document Presentation SENARIO 2 MODIFIED OPD 9/23/2009

  8. Project Background User(s) makes changes in the presentations WIKI ENGINE Java Plug-in Java Plug-in ODP FILE Web page ODP – Open Document Presentation SENARIO 2 MODIFIED OPD 9/23/2009

  9. Project Background User(s) makes changes in the presentations WIKI ENGINE Java Plug-in Java Plug-in ODP FILE Web page ODP – Open Document Presentation SENARIO 2 MODIFIED OPD 9/23/2009

  10. Step towards Milestones User(s) makes changes in the presentations WIKI ENGINE Java Plug-in Java Plug-in ODP FILE Web page ODP – Open Document Presentation SENARIO 2 MODIFIED OPD 9/23/2009

  11. Step towards milestones - Development Plug-in to import slides as images in Wiki Engine Plug-in to import ODP file into Wiki Engine Plug-in to export the modified presentation in ODP format. Functionality to modify the presentation by means of XML Database design for comments and other data Functionality of reading XML and XSLT files. 9/23/2009

  12. Step towards milestones - Development Plug-in to import slides as images in Wiki Engine Plug-in to import ODP file into Wiki Engine Plug-in to export the modified presentation in ODP format. Functionality to modify the presentation by means of XML Database design for comments and other data Functionality of reading XML and XSLT files. 30 % of total work 9/23/2009

  13. Step towards milestones - Others Systems Design 10% Systems Design 10% Systems Design 10% System Integration 5% effort Documentation And others 10% Documentation And others 10% Requirement Analysis 20% Requirement Analysis 20% Requirement Analysis 20% Requirement Analysis 20% Requirement Analysis 20% Requirement Analysis 20% Testing 25% Testing 25% Testing 25% Testing 25% Testing 25% Testing 25% 9/23/2009

  14. Development methodology and Milestones Iterative Waterfall Model (Iterations)

  15. Development methodology and Milestones Development 1st Milestone Alpha release 27th October 09 2nd Milestone Beta release 17th November 09 3rd Milestone Release Candidate 15th December 09 Development Development Final Product 15th January 10 9/23/2009

  16. Deliverables 9/23/2009

  17. Activity Plan 9/23/2009

  18. Financial Plan Cost per hour = 33$ (assumption) Number of working days = 85 Total estimated cost = $ 33,660 9/23/2009

  19. Project risks Resources Limitation of time Wrong Technology Communication gap Server Crash Technical Knowledge Design Flaws Team Coordination --- High Risk --- Medium Risk 9/23/2009