RANCANG BANGUN Sistem Informasi PERENCANAAN PERSEDIAAN barang. Andy Wijaya 06.41010.0272. Saluran Distribusi. Identifikasi Permasalahan. Jumlah permintaan dari sales center yang fluktuatif .

gavivi
Download Presentation

RANCANG BANGUN Sistem Informasi PERENCANAAN PERSEDIAAN barang

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RANCANG BANGUN SistemInformasi PERENCANAAN PERSEDIAAN barang Andy Wijaya 06.41010.0272

  2. SaluranDistribusi

  3. IdentifikasiPermasalahan • Jumlahpermintaandarisales center yang fluktuatif. • jumlahpersediaan yang harusdisiapkanoleh PT. Panamas DwitamaDistrindomenjaditidakstabil. • Perusahaan kesulitandalammenentukanstokminimum. • Perusahaan kesulitanmenentukanwaktupemesanankembali. • Perusahaan kesulitandalammenentukanberapajumlahpesananbarang yang sesuai.

  4. Economic Order Quantity • Jumlahunit (kuantitas) barang yang dapatdibelidenganbiayaminimal. • Tujuan: menentukanjumlahpesanan yang dapatmeminimumkanbiayapenyimpanandanbiayapemesanan. • Q = jumlah/nilai EOQ (unit). • C = biayapemesanan per pesanan. • R = permintaan per periode (unit). • H = biayapenyimpanan.

  5. Reorder Point • Titikdi manaharusmelakukanpemesanankembalikarenapersediaanmenurunakibatdikonsumsiataudijual. B = RL / N • Jikaadastokpengamanatau buffer stokmaka: B = RL / N + buffer stok Reorder Point:Bila L dinyatakan dalam bulan: Bila L dinyatakan dalam minggu: • B = titikpemesanankembali. • R = permintaan per periode (unit). • L = waktutunggu (lead time). • N = periodepermintaan.

  6. Contoh EOQ • Contoh 1: Perusahaan ABC membeli 8000 unit produktiaptahundenganbiaya $10. Biayapemesanan $30 per pemesanan, danbiayasimpantiap unit per tahun $3. Berapa EOQ? • Penyelesaian: • Contoh 2: PadaContoh1, berapa total biayauntuk EOQ per tahun, banyakpesanan yang harusdipesanselamasetahun, danreorder point bilalead time-nyaadalahduaminggu? • Penyelesaian:

  7. Contoh EOQ • total biayauntuk EOQ per tahun (dalam$): Keterangan:TC(Q*) = total biaya EOQ per tahunP = purchase of an item • banyakpesanan yang harusdipesanselamasetahun: Keterangan :m = banyaknyapesananselamasetahun (pesanan per tahun)

  8. Contoh EOQ • reorder point (unit): • Kesimpulan:Jadi, untukmencapainilai yang ekonomis, Perusahaan ABC harusmemesan 400 unit produkdengan total biayapemesanansebesar $81200. Produktersebutdipesansebanyak 20 kali selamasetahun. Perusahaan ABC harusmemesanpadasaatpersediaantersisa308 unit.

  9. TERIMAKASIH