An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TEAMFLAgency Update January 2011

  2. Traffic & Revenue Growth

  3. Traffic & Revenue History

  4. Actual vs. Forecasted Revenue

  5. Operating Expenses • Total Operating Expenses- $31.5 Million* -Decrease of 2.1% from FY 2009 • Annual OM&A within 5.2% of fiscal year 2010 Budget • Routine Maintenance $6.0 Million in FY 2010 - SHS Maintenance Condition Rating -90.9 • Cost to Collect a Toll Transaction 12 cents *(excluding depreciation and amortization)

  6. Long-Range Planning • SR 836 SouthWest Extension (83618) - PD&E advertisement in January 2011 • SR 874 Ramp Connector (87410) - PD&E underway • SR 924 Extensions West to the HEFT/East to I-95 (92404, 92407) - PD&E underway • Connect 4 Xpress (20001) - PD&E advertisement in May 2011 • US 1 Express Lanes (20003) - PD&E underway

  7. ORT Implementation • SR 112 ORT Conversion & Infrastructure Modifications (10016, 11209) • Go Live in Summer 2012 • SR 836 ORT Conversion & Infrastructure Modifications for the East and West Sections (10017, 83624, 83631) • Go Live in Summer 2013 • SR 836 ORT Conversion & Infrastructure Modifications for the Central Section (10017, 83632) • Go Live in Summer 2014

  8. ITS/Technology Advancement • Systemwide Implementation of Dynamic Message Signs (10019) • Installation of state-of-the-art full color signs to be completed in fiscal year 2013 • ITS Master Plan (10020) • Completed in fiscal year 2011 to identify future use of technology and benefits of ITS applications for operational improvements • Systemwide ITS Improvements (10021) • Development and procurement of ITS improvements resulting from the ITS Master Plan recommendations to begin in fiscal year 2012

  9. Capacity/Operational Improvements • SR 836 Eastbound Auxiliary Lane (83622) • Open to traffic at end of Summer 2011 • SR 836 Auxiliary Lanes and Interchange Improvements (83628) • Project Development underway • Project to be delivered as a Design-Build and funded in future work programs • SR 836 Interchange Improvements at 87 Avenue (83629) • Final design to begin in fiscal year 2012 • SR 874/Killian Parkway Interchange (87404) • Open to traffic at end of 2011 • SR 874 Mainline Reconstruction (87409) • Design-Build to begin in fiscal year 2012

  10. Key Partnerships • Central Boulevard Reconstruction (11211) • Partnership with FDOT/MIA for 50/50 cost sharing. Project underway • SR 826 / SR 836 Interchange Improvements (83608) • Joint Participation Agreement with FDOT for $196.5M toward construction • SR 924 Extension West to the HEFT (92404) • Partnership with City of Hialeah & MD County for improvements to 138 St. • SR 878 / US 1 Interchange Improvements (87802) • Project development of operational improvement at the SR 878/US 1 interchange • MIC-DadelandBusway Study (20004) - Partnership with Florida East Coast (FEC) Railway to study the feasibility of bus service using the existing FEC Oleander Corridor between the MIC and Dadeland

  11. FY 2010 Accomplishments • Awarded a total of $55.5 million in contracts for professional and construction services • 19% was committed to Small Businesses • Offered free of charge training to Small Businesses which led to 25 firms obtaining technical certifications for construction related services • Adopted a Local Business Preference Policy in Procurement and certified over 120 firms • Conducted rating agencies presentations, affirming ratings with positive outlook • Compliance with Bond Covenants 1.56 Senior Debt Coverage

  12. FY 2010 Accomplishments • Spent $119.5 million in capital, safety and system preservation projects in FY 2010 • Open Road Tolling conversion: • SR 924 Gratigny Parkway – June 7, 2010 • SR 874 Dolphin Expressway – July 17, 2010 • SR 878 Snapper Creek Expressway – July 17, 2010 • Met ALL 17 FTC performance measures (FY 2010)