An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NTTAAgency Update May 4, 2006 Allan Rutter, Executive Director North Texas Tollway Authority

  2. ADDISON AIRPORT TOLL TUNNEL OPEN TO TRAFFIC 1999 MOUNTAIN CREEK LAKE BRIDGE OPEN TO TRAFFIC 1979 DALLAS NORTH TOLLWAY EXTENSION PHASE I APPROX. 9.7 MILES OPEN TO TRAFFIC 1987 DALLAS NORTH TOLLWAY EXTENSION PHASE II APPROX. 4.4 MILES OPEN TO TRAFFIC 1994 PRESIDENT GEORGE BUSH TURNPIKE SEGMENT I APPROX. 7.3 MILES OPEN TO TRAFFIC 1999 PRESIDENT GEORGE BUSH TURNPIKE SEGMENT II APPROX. 5.0 MILES OPEN TO TRAFFIC 2000 PRESIDENT GEORGE BUSH TURNPIKE SEGMENT III APPROX. 5.5 MILES OPEN TO TRAFFIC 2001 PRESIDENT GEORGE BUSH TURNPIKE SEGMENT V APPROX. 3.5 MILES OPEN TO TRAFFIC 2001 PRESIDENT GEORGE BUSH TURNPIKE SEGMENT IV APPROX. 5.4 MILES OPEN TO TRAFFIC SEPTEMBER 9, 2005 ORIGINAL DALLAS NORTH TOLLWAY APPROX. 9.5 MILES OPEN TO TRAFFIC 1968 NTTA Facilities

  3. DALLAS NORTH TOLLWAY EXTENSION PHASE III APPROX. 9.2 MILES SCHEDULED TO OPEN September 2007 DALLAS NORTH TOLLWAY AT SH 121 INTERCHANGE OPEN TO TRAFFIC 2004 NTTA Facilities

  4. Dallas North Tollway Phase 3 • SH 121 to US 380 (Approximately 10 miles) • Bonds sold in March 2005 • Construction is underway • Estimated project cost of $264 M • Anticipated open to traffic in September 2007

  5. PGBT Eastern Extension Lewisville Lake Toll Bridge Southwest Parkway Trinity Parkway NTTA Future Projects

  6. Lewisville Lake Toll Bridge

  7. Lewisville Lake Toll Bridge Proposed Bridge Profile

  8. Southwest Parkway ProjectSH 121T - 9.1 miles- New alignment- Segment of 28.8-mile, multi-agency corridor - Opens in 2009

  9. Southwest Parkway ProjectSH 121TSouthern Section

  10. PGBT Eastern Extension • Total Length: 9.9 miles • 6 ramp plaza pairs • 1 main lane plaza • Six lanes with space to accommodate eight lanes • Interchanges with SH 78 and IH 30 • Two Major Bridges • Rowlett Creek (0.8 miles) • Lake Ray Hubbard (1.0 mile) • Open to traffic: 2010

  11. PGBT-EE Frontage Road Project

  12. Trinity Parkway EIS NoAction I-35E Tollway Central Expy 183 Loop 12 Lemmon 2 Industrial Alternatives Irving I-30 Singleton CBD Westmoreland I-30 Hampton Lamar Hatcher Beckley US 175 Jefferson Corinth 3 River Alternatives + 1 “Variation” I-45 I-35E

  13. 3B - Combined Pky. Modified Alternative 3B

  14. PGBT Eastern Extension Lewisville Lake Toll Bridge Southwest Parkway Trinity Parkway $300 Million in CIP Projects NTTA Future Projects

  15. President George Bush TurnpikeImprovements • Completed median barrier project • Expanded frontage roads beyond SH 78 • Landscaping is well underway • Toll plaza improvements beginning

  16. Design Concept: DNT/LBJ Interchange

  17. System Wide Design Pavement Rehabilitation Cedar Springs Bridge Replacement Reconstruct MLP 1 Wycliff Bridge Widening N Oak Lawn Project Pegasus DNT South End Improvements • Oak Lawn • 100% design • Bid in December 2005 • South End Wycliff/Cedar Springs • 100% design • Bid in December 2005 • MLP 1 • Architectural, 100% design; site work, 100% design • Site work bid in January 2006 • Canopy bids in 2007 Harry Hines Lemmon Ave. Maple Ave. MLP 1 Wycliff Ave. Oak Lawn Ave. Cedar Springs

  18. MLP 1 Replacement

  19. LED Changeable Message Signs Pilot project-contractor notice to proceed issued Pilot project complete in November 2005 System-wide implementation planned with plaza reconstruction System-Wide Projects

  20. Closed-Circuit Television (CCTV) Cameras NICE Vision Proof of Concept Demonstration

  21. Thank You Allan Rutter Executive Director North Texas Tollway Authority (214) 461-2000