Modernisation of

Modernisation of. Opencast Mining Technology. For. Higher Production and Productivity T.K.Nag CMD NCL. STRATEGIC IMPORTANCE OF INDIAN COAL SECTOR. Around 77 % of coal consumed met through indigenous source CIL produces 81.73% of India’s current coal production.

gblom
Download Presentation

Modernisation of

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Modernisation of Opencast Mining Technology For Higher Production and Productivity T.K.Nag CMD NCL

  2. STRATEGIC IMPORTANCE OF INDIAN COAL SECTOR • Around 77% of coal consumed met through indigenous source • CIL produces 81.73% of India’s current coal production Coal – India’s Primary Source of Energy * Others 9.4 % SCCL 8.9% CIL 81.7% Coal Production : Company -wise Share Sector-wise Supply Share from CIL Sources ** Others include cement, sponge iron, fertilizer. Bricks etc * Others include captive producer ,TATA STEEL, Meghalaya & Other PSUs 2 Source : Coal Controller

  3. Open Cast Mining in Coal India Limited • Spread over in Eight States • ~ Jharkhand, WB, Orissa, CG, MP, UP, Maharashtra & Assam • Operates 430 Mines through 82 Areas • OC Mines-175 • Contribution of OC has crossed 93 %.

  4. Existing Scenario – Opencast Mining • Dragline • Shovel-Dumper Combination • Surface Miner • In-Pit Crushing & Conveying

  5. Existing Size & Population of Equipment- CIL Mines OC Mines: Draglines ( 5 m3 to 30 m3) : 36 Nos Excavators (1.2 m3 to 42 m3) : 704 Nos Dumpers (35 T to 240 T) : 2829 Nos Crawler Dozer (320 HP to 850 HP) : 916 Nos Drill (100 mm to 350 mm) : 676 Nos Source : CMPDI

  6. *One Bt Production: Projection for Next 5 Years Mt * 908 Mt identified; Further identification underway

  7. OB Removal Projection (MM3) - CIL Present Striping Ratio: 1.8; In 19-20, Striping Ratio – 2.75

  8. 100% Coal Production in NCL by Departmental means

  9. Future Options of Technology & Mechanization – Perspective of CIL

  10. POTENTIAL AREAS FOR IMPROVEMENT IN OPENCAST MINING TECHNOLOGY NCL

  11. T NCL

  12. TECHNOLOGICAL UPGRADATION NCL

  13. TECHNOLOGICAL UPGRADATION NCL

  14. Way forward NCL Long term contract with OEM for maintaining DEPOT of all Major HEMMs

  15. Human Capital – Skill Development NCL

  16. Technology Up-gradation – OC Mines

  17. Technology Up-gradation – OC Mines

  18. Technology Up-gradation – OC Mines

  19. Training of Manpower : Skill Development

  20. Technology Up-gradation – Mine Safety

  21. Technology Up-gradation – Information Technology

  22. Other System Improvements • E procurement of equipment & spares • Reverse Tendering of Work & Services • Establishment of connectivity

  23. Eco-restoration work through FRI, Dehradun at Nigahi And Krishanshila on 10 Hact OB dump Ground cover after one year