Wetherbee Road Design-Build Project: Improvements and Schedule

This presentation outlines the design-build process, recommended improvements, project schedule, and action requested for the Wetherbee Road project from Balcombe Road to Orange Avenue. It includes details on project need, data collection, environmental and traffic analysis, potential improvements, and public involvement.

gearys
Download Presentation

Wetherbee Road Design-Build Project: Improvements and Schedule

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Design-Build Project Wetherbee Road Balcombe Road to Orange Avenue 1.5 miles BCC Public Hearing Public Works Department Commission District 4 August 5, 2008

  2. Presentation Outline • Design Build Process • Recommended Improvements • Project Schedule • Action Requested

  3. Presentation Outline • Design Build Process • Recommended Improvements • Project Schedule • Action Requested

  4. Design Build Process • What is Design Build? • Confirm Project Need • Data Collection • Environmental • Traffic • Evaluate Potential Improvements • Identify Preferred Improvements • Public Involvement

  5. Design Build Process • What is Design Build? • Confirm Project Need • Data Collection • Environmental • Traffic • Evaluate Potential Improvements • Identify Preferred Improvements • Public Involvement

  6. What is Design Build? • Streamlined Process • Works Well with Right-of-Way in Place • Designer and Construction Contractor Work Together • Savings in Time and Schedule

  7. Design Build Process • What is Design Build? • Confirm Project Need • Data Collection • Environmental • Traffic • Evaluate Potential Improvements • Identify Preferred Improvements • Public Involvement

  8. Project Need • Previously Identified • Transportation Network • Enhancements

  9. Previously Identified Project Need

  10. Project Need Transportation Network

  11. Project Need Transportation Network

  12. Project Need • Enhancements • Pedestrian Network • Lighting

  13. Design Build Process • What is Design Build? • Confirm Project Need • Data Collection • Environmental • Traffic • Evaluate Potential Improvements • Identify Preferred Improvements • Public Involvement

  14. Data Collection • Environmental • Existing Stormwater Permits • Subsurface Soil Exploration • Natural Environment Assessment • Contamination Assessment

  15. Data Collection • Traffic • Traffic Counts • Intersection Movements • Adequate Storage • Central Florida Regional Traffic Model

  16. Data Collection

  17. Design Build Process • What is Design Build? • Confirm Project Need • Data Collection • Environmental • Traffic • Evaluate Potential Improvements • Identify Preferred Improvements • Public Involvement

  18. Potential Improvements • Alignment • Right-of-Way Established • Bridge Constraints • Add Lanes South Side • No Access Management Issues

  19. Potential Improvements

  20. Design Build Process • What is Design Build? • Confirm Project Need • Data Collection • Environmental • Traffic • Evaluate Potential Improvements • Identify Preferred Improvements • Public Involvement

  21. Preferred Improvements

  22. Design Build Process • What is Design Build? • Confirm Project Need • Data Collection • Environmental • Traffic • Evaluate Potential Improvements • Identify Preferred Improvements • Public Involvement

  23. Public Involvement • Newsletters • Direct Mail • Web Site • Public Meeting November 2007 • Coordination with HOA’s

  24. Presentation Outline • Design Build Process • Recommended Improvements • Project Schedule • Action Requested

  25. Recommended Improvements • Additional Two Lanes • Additional Bridge • New Traffic Signal at Bohannon Blvd • EB Right Turn Lane at Bisted Dr • EB Right Turn Lane at Balcombe Rd • Sidewalk Connections • Roadway Drainage • Landscaping & Lighting

  26. Recommended Improvements

  27. Recommended Improvements

  28. Recommended Improvements

  29. Recommended Improvements

  30. Recommended Improvements

  31. Recommended Improvements

  32. Recommended Improvements

  33. Recommended Improvements

  34. Presentation Outline • Design Build Process • Recommended Improvements • Project Schedule • Action Requested

  35. Newsletter * Public Meeting Public Hearing LPA – Local Planning Agency BCC - Board of County Commissioners Project Schedule 2007 2008 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Data Collection Eng. & Environ. Analysis Develop Concepts Prepare Bid Documents Bid Project * Public Meeting LPA BCC LPA

  36. LPA Action • June 19, 2008 • Unanimous Approval of the findings of the Wetherbee Road Design Build Report • Found the project consistent with the Orange County Comprehensive Policy Plan

  37. Presentation Outline • Design Build Process • Recommended Improvements • Project Schedule • Action Requested

  38. Action Requested • Approval of the Wetherbee Road Design Build Project Preliminary Engineering Study Report and proceed with bid advertisement of the project

  39. Design-Build Project Wetherbee Road Balcombe Road to Orange Avenue