An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Topical session III: High-power test areas Summary Objective: Review the status of possibilities for test stands at collaborating institutes. The situation is far better than I had thought. W. Wuensch CLIC collaboration meeting 11-5-2012

  2. High power RF network RF vacuum valve RF vacuum Pumping port CLIC accelerating structure under test RF loads RF pulse compressor Bidirectionnal coupler 50 MW Klystron Solid state Modulator

  3. Possible locations at Saclay Saclay Accelerator Plateform ‘Synergium’ « Clean lab », availablenow My office! « Fosse Amalthée »: ~ 230 m² at the basementlevel, need to berestaured STATION D’ESSAI CLIC 12 GHz We have all the necessary infrastructure (crane capacity , electrical power, cooling power and concrete shielding blocks) The future location of the test stand isstill in discussion IFMIF injector(bunker available in 2013) SPIRAL2 injector (bunker available in 2013) 10 m

  4. Tentative planning Feb 2014: CPI Klystron receivedat Saclay Apr 2014: Modulatorinstalledat Saclay Jan 2015: Operation on accelerating structure

  5. Equipment • EXISTING EQUIPMENT • 5 high-vacuum chambers(min. press. 10-8 mbar), • Power amplifiersfrom 435 MHz to 30 GHz • Severalspectrumanalyzers, network analyzers, … • Waveguides, directionalcouplers, cables, attenuators, circulators, isolators, bolometersand others • Multichannelmultipactor station , unique in the world • Electron sources: electron gun, 90Sr, Hg ultraviolet sources • XPS-UPS, SEM, electronicspectroscopy • Evaporation system for layer growing and outgassingstudies • 2 clean rooms class 10000 (equivalent to ISO 7) • +mechanics & electronics workshop (2D and 3D metrology system) • TO BE FUNDED • 9.3 GHz pulsed klystron: 6 MW peak, 6 kW average • Modulator Vacuum chamber XPS-UPS 9 GHz pulsed klystron

  6. In addition verbal reports from: • Sincrotrone, Trieste • JINR, Dubna • PSI