Roles & Responsibilities in Construction Management

Roles & Responsibilities in Construction Management . Ben Shuman, PE Senior Environmental Engineer USDA, Rural Utilities Service (202) 720-1784 b en.shuman@wdc.usda.gov. First Let’s Talk About Roles & Responsibilities. Partners. Owner Funding Agencies Consulting Engineer

gen
Download Presentation

Roles & Responsibilities in Construction Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Roles & Responsibilities in Construction Management Ben Shuman, PE Senior Environmental Engineer USDA, Rural Utilities Service (202) 720-1784 ben.shuman@wdc.usda.gov

  2. First Let’s Talk AboutRoles & Responsibilities

  3. Partners • Owner • Funding Agencies • Consulting Engineer • Construction Contractor

  4. Owner • What are the owner’s responsibilities? • Need to be fully informed • Make final decisions on planning • Hire the engineer and contractor • Pay on time! • Resolve disputes

  5. Consulting Engineer • Responsibilities before award: • PER (which defines scope) • Preliminary Design • Plans and specifications • Coordinates and assists in bidding/award

  6. Engineer’s Role (continued) • After award: • Owner’s representative • Provide Resident Project Representation • Evaluate shop drawings • Visit site and observe construction • Reject defective work, evaluate change orders, and pay estimates • Determine final quantities for unit prices

  7. Visits to Site by Engineer • Visit site as needed to observe as an experienced/qualified design professional; • Review progress and quality of work for benefit of owner; • Determine in general if work is proceeding per contract documents

  8. Engineer’s Role (continued 2) • Evaluate substitutes and “or equals” • Make clarifications and provide initial decisions on disagreements • Determine substantial completion • Write punch list • Recommend Final Payment to the Owner

  9. Limitations on Engineer’s Authority (and RPR) • Will not supervise, direct, control, have authority over or be responsible for: • means, methods, techniques, sequences, procedures of construction; • safety precautions or programs; • Acts or omissions of contractor, subs, or suppliers;

  10. Limitations on Engineer’s Authority (continued) • Review of pay requests, documentation, operating instructions, schedules, guarantees, bonds, inspections, tests, approvals is: • only to determine generally that content complies.

  11. Brief explanation of RD

  12. Rural Development • Program Director • State Engineer • State Environmental Coordinator • Area Director • Area Specialist

  13. Specialist • Provide information about the program • Main Point Of Contact • Performs some review of PER • completeness • financial info • Construction management • Loan servicing

  14. State Engineer • 1/3 of job is engineering (the easy part) • 2/3 is people (the hard part)

  15. Here’s the short story... • Reduce risk to the Agency and taxpayer • Provide an opinion to the Management

  16. In Prioritized Order... • PER • Engineering Agreement • Review plans and specifications • Execute construction contracts • Construction management

  17. Contractor • Build it per plans and specs • On time • Within budget • Absolute obligation to perform and complete the work in accordance with contract documents

  18. Contractor’s Responsibilities • Supervise, inspect, and direct the work • Responsible for site, materials, equipment, and schedule • Responsible for all subs and suppliers • Responsible for site safety • Maintains record documents at site

  19. What are the typical steps in a project?

  20. From Cradle to Grave • Need for Project • Working with a Technical Assistance Provider • Selecting an engineer • Application • Design • Bidding and award • Construction • Operations (loan servicing)

  21. Selecting an Engineering Firm • Owner develops Statement of Work (SOW) • Request For Qualifications (RFQ) process • Owner makes an informed decision

  22. Statement of Work • What is a SOW • How to develop a good SOW

  23. Request for Qualifications • What is an RFQ and its purpose • How to select the best engineering firm

  24. Deliverables • What are the Engineering deliverables? • PER • 60% design • 100% design • Construction services • warranty inspection • What are the due dates for the deliverables?

  25. Bid & Award of Contract • RD’s requirements • Open and free competition • Use of standard contracts unless approved otherwise • No conflict of interest • Competitive bidding • Low bid vs “Best Value”

  26. Construction Management

  27. Construction Management • Why do we even do it? • Protect the interest of the owner • Protect the interest of the taxpayer

  28. Components • Pre-construction Conference • Monthly construction meetings (Partial Payments) • Change orders • Engineer Invoices • Prefinal Inspection • Punch List • Final inspections • Warranty Inspection

  29. Pre-construction Meeting • Led by consulting engineer • All parties involved attend • RD has an outline of items to discuss • Clearly describe expectations for project – timelines, payments, change orders, etc. • Written record of meeting signed by all

  30. Monthly Construction Mtgs • Led by consulting engineer • RD Specialist sometimes State Engineer or Construction Analyst also • Updated progress schedule from contractor if needed • Payment requests • The dreaded change order

  31. Change Orders • Sometimes generated by contractor • Recommended by consulting engineer • May involve additional design work • RD • Confirms availability of funds • Scans for eligible purpose • Approval

  32. Pay Requests • Quantities of work completed (unit prices) • Or based on schedule of values (lump sum) • Materials stored on or near site • RD forms signed by Engineer & Owner • RD Specialist confirms eligibility & funds • Compare % complete with % time complete

  33. Roles of the Inspector • The inspector only does two things • Observe & report • Know the contract • Document in a daily log record book • Take photos • Safety

  34. Safety • Know the safety plan • Inspector should let appropriate people know immediately of safety concerns or violations

  35. What Inspector Should Not Do • Do not direct the contractor • Do not act as engineer • Do not act as owner • Know what authority you have (almost none)

  36. Costs of Inspection • $50 - $100 per hour ($8K-$18K per month) • 4-7% of estimated construction cost • If contractor goes beyond allowed time, liquidated damages should pay for additional inspection costs • Budget enough money up front – should not use contingency funds

  37. Common Problems • Inspector not on site • Inspector directs contractor • Inspector makes deals

  38. Inspections – Prefinal and Final • Coordinate with Substantial Completion • Start of warranty period • Critical players • Owner/operator • Consulting Engineer/Resident Inspector • Contractor • Funding agencies • Final inspection confirms punch list completed • Triggers final payment

  39. Warranty Inspection • 11 months after substantial completion • RD State Engineer should attend • Good idea to talk to operator • Any concerns should be addressed in writing to contractor • As-builts, O&M manuals

  40. Liquidated Damages • Not a penalty • Should be enforced uniformly • Amounts established in advance • Interest • Engineering/Inspection • Administrative costs • Other costs

  41. Contractor Default • Follow contract terms & notice requirements • Check state laws that may apply • Allow surety reasonable time to respond • Notify state licensing agency and Treasury Department if surety is unresponsive

  42. Servicing andOperation & Maintenance • Run your system like a business • “Sustainable” systems

  43. “Take-Aways” • Know your roles & responsibilities • If you’re more than one year past start of project and you haven’t gone to bid, it’s time to act • Owner is responsible for the project • Contractor is responsible for meeting terms of contract

  44. Questions?Ben Shuman, PESenior Environmental EngineerRural Utilities Service202-720-1784ben.shuman@wdc.usda.gov