1 / 27

THE PRESENTATION

THE PRESENTATION. Mark Corney, MC Consultancy. PROCESS. The Leitch Recommendations – Chapter 8 Leitch in its own Terms – Critical Assessment - Skills Ambitions - Strategic Messages The Political Envelope. FINAL LEITCH REPORT. LEITCH UK-WIDE Adults + HE + Welfare to Work

genesis
Download Presentation

THE PRESENTATION

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. THE PRESENTATION Mark Corney, MC Consultancy

  2. PROCESS • The Leitch Recommendations – Chapter 8 • Leitch in its own Terms – Critical Assessment - Skills Ambitions - Strategic Messages • The Political Envelope

  3. FINAL LEITCH REPORT LEITCH UK-WIDE Adults + HE + Welfare to Work Not 11/14-19

  4. FINAL LEITCH REPORT The skills ambitions are the centrepiece of the Final Leitch Review!

  5. FINAL LEITCH REPORT Do not underestimate the Leitch Review. It’s like a Russian novel! 2020 SKILLS AMBITIONS

  6. FINAL LEITCH REPORT Do not underestimate the Leitch Review. It’s like a Russian novel! The devil is in the detail! 2020 SKILLS AMBITIONS

  7. FINAL LEITCH REPORT Do not underestimate the Leitch Review. It’s like a Russian novel! The devil is in the detail! 2020 SKILLS AMBITIONS

  8. FINAL LEITCH REPORT 2020 SKILLS AMBITIONS

  9. THE SKILLS AMBITIONS Changes in the 2020 qualifications profile between ILR and FLR if all UK targets met and sustained

  10. FINAL LEITCH REPORT 2020 SKILLS AMBITIONS

  11. THE SKILLS AMBITIONS • Existing UK targets are challenging but if met and sustained the UK will improve in the world league tables. • But the UK would not be world class. • Definition of world class – upper quartile of the OECD average at below L2, Level 2, Level 3 and L4+. • Numerical benchmark across countries with different systems. • Be in the top 8 out of 30 OECD countries.

  12. FINAL LEITCH REPORT 2020 Skills Ambitions the Centrepiece of FLR 2020 SKILLS AMBITIONS

  13. FINAL LEITCH REPORT 2020 Skills Ambitions the Centrepiece of FLR 2020 SKILLS AMBITIONS

  14. THE SKILLS AMBITIONS • Existing UK targets are challenging but if met and sustained the UK will improve in the world league tables. • But the UK would not be world class. • Definition of world class – upper quartile of the OECD average at below L2, Level 2, Level 3 and L4+. • Numerical benchmark across countries with different systems. • Be in the top 8 out of 30 OECD countries.

  15. FINAL LEITCH REPORT Unfortunately we do not get a chart such as this……. 2020 SKILLS AMBITIONS

  16. Final Leitch Report

  17. THE SKILLS AMBITIONS FLR 2020 Projections compared to 2020 Skills Ambitions

  18. THE SKILLS AMBITIONS 2020 Skills Ambitions the Centrepiece of FLR • Adults below L2 cut by 50% • Adult L2 is only up by 10% • Adult L3 is only up by 18% • Adult L4+ is the same Adult Level 3 relative to Adult Level 4 is the winner but only because expansion of Adult Level 4+ is not recommended.

  19. FINAL LEITCH REPORT 2020 SKILLS AMBITIONS

  20. THE SKILLS AMBITIONS

  21. Final Leitch Report

  22. THE SKILLS AMBITIONS Stylised Scenarios

  23. THE SKILLS AMBITIONS • qualifications not skills agenda • full qualifications not units agenda • first full qualifications agenda • national and international equivalency agenda • vertical not lateral progression agenda • upskilling not a reskilling agenda • vocational upskilling agenda

  24. STYLISED SCENARIOS

  25. STYLISED SCENARIOS

  26. SKILLS AMBITIONS 2020 Skills Ambitions – up to Adult Level 3 [excluding 40% L4+ ] Productivity Output per year annual productivity growth is 0.1% from 2% (PBR says 2.4%) Employment 200,000 extra workers employment rate rises by 0.2 by 2020 percentage points each year Net Benefit £80bn over 30 years average benefit £2.5bn per year Additional Total £1.5/£2.0bn p/a direct course provision? Annual Cost by 2020

  27. SKILLS AMBITIONS 2020 Skills Ambition up to adult L3 compared to Stylised Scenarios 2020 Range of Stylised Scenarios • Productivity growth 0.1% 0.03%-0.24% above trend above trend • Employment 0.2 0.15-1.0 percentage percentage points by 2020 points by 2020 • Additional Cost £1.5/£2bn £0.8bn-£3.0bn

More Related