Renewable Energy in Morocco Renewable Energy in Morocco Stuttgart, 13th November 2010
Renewable Energy in Morocco Huge Solar and Wind Potential
Renewable Energy in Morocco The legal and institutional Reforms The 3 laws have been passed in 2010….
Morocco as Regional Energy Platform Renewable Energy in Morocco • Since 1997 Morocco is connected to Spain via the strait of Gibraltar • 2 lines 400 KV of 26 km long • Transit capacity : 1400 MW • Project of 3rd line 400 KV • The network with Algeria is operating since 1988 • Oujda-Ghazaouet : 46 km long - capacity of 200 MW • Oujda-Tlemcen : 67 Km long -capacity of 200 MW • 3rd connection of 400 KV is in process bringing the total transfer capacity to 1200 MW
Wind projects Tanger 140 MW Torres 50MW The diversification process of the energy bouquet has already started with 280 MW . . . Jbel Khalladi 120 MW Lafarge 30MW Haouma 50 MW Essaouira 60 MW Taza 150 MW (2015) Tarfaya 300 MW Laayoune 200 MW Bab El ouad 50 MW The objective is to build a capacity of 1000 MW by 2012
Renewable Energy in Morocco Solar projects SITE OF AÏN BÉNI MATHAR DNI: 2290kWh/m²/year Capacity : 400 MW Surface : 2000 hectares Generation : 835 GWh / yr SITE OF SEBKHATE TAH DNI: 2140kWh/m²/year Capacity : 500 MW Surface : 2500 hectares Generation : 1040GWh / yr SITE OF OUARZAZATE DNI: 2635kWh/m²/year Capacity : 500 MW Surface : 2500 hectares Generation : 1150 GWh / yr SITE OF BOUJDOUR DNI: 2642kWh/m²/year Capacity : 100 MW Surface : 500 hectares Generation : 230 GWh / yr SITE OF FOUM AL OUAD DNI: 2628kWh/m²/year Capacity : 500 MW Surface : 2500 hectares Generation : 1150GWh / yr
Renewable Energy in Morocco Project Timetable Announcement of Moroccan Solar Project Launch of Tenders 1st site entering into service Entering into service of all sites Pre-selection of candidates for Ouarzzazate construction Starts
Renewable Energy in Morocco A public-private partnership approach The implementation of all projects will be done through… • Partnerships with national and international operators • Choice of developers based on competition and with open technologies options (PV, CSP, ...etc) • Diversified funding mechanisms
The Moroccan energy mix by 2020 The part of installed capacity of renewable energy will represent 42% of total electric installed capacity by 2020
Renewable Energy in Morocco DESERTEC • Morocco strategic location, huge solar potential and Concrete National Energy Strategy • Nareva Holding, joined the Desertec Industrial Initiative DII in march 2010 • Driss Benhima, CEO of Royal Air Maroc, is a member of the International Advisory Board of DII that will support it in the implementation of the ‘Desertec’ initiative • First Solar pilot project in Morocco of 500 MW is announced
Renewable Energy in Morocco Germany’s involvement • Wind Energy: KFW provides financial support to Tangier and Essaouira parks (50 millions Euros loan for each) • Hydraulic Energy: Financial support for the construction of Tanafnit, El Borj et Tilougguit plants and for renovation of 20 others (137 millions Euros). (Cooperation for Development) • Solar Energy: Rural electrification through the installation individual solar kits (PERG) : 5,1 millions Euros of subsidies and 10,0 millions Euros loans. (Cooperation for Development) • Total subsidies and loans: 252,1 millions Euros
Renewable Energy in Morocco Conclusion • Huge Potential of clean energy sources • Strategic geographical location • Favourable business environment • Legal, regulatory and institutional reforms to promote the sector • Commitment to strengthening the international cooperation
Renewable Energy in Morocco Thank you
Thermo-solar project Beni Mathar • Site : Ain BeniMathar (86 km au Sud d’Oujda) • Capacity : 472 MW (20 MW Solar) • Size : 20 Ha • Date of Production : 2010 • Contribution : 8.5 % of National consumption • Project owner : National Electricity Office (ONE) • Cost : 452 millions euros • BAD 287.7 millions • ONE 100 Millions • World environment Fund 36.6 millions
Tangier I Wind Park 140 MW • Capacity : 140 MW • Engine : 165 Gamesa 850 kW • Production : 526 GWh/year • Average Annual wind speed (40 m) : 9 m/s • Feasibility Project : ADEREE • Project : National Electricity Office (ONE) • Date production : 2010 • Cost : 250 Millions Euro • ICO, a Spanish fund, 100 millions • BEI 80 million • KFW 50 million • ONE 20 million